- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
8A汽油机使用手册(8A gasoline engine use manual)
8A汽油机使用手册(8A gasoline engine use manual)
Use manual for type 8A gasoline engine
Chapter 1 technical specifications of gasoline engines
Type: 8 a
Type: four cylinder, water cooling, double top mounted camshaft, 16 steam door mechanism, gear drive, roof type combustion chamber. EFI, open-loop control and closed-loop control of the electric control system type electric control fuel injection system. Flow control: speed density mode (d-j). Electronic ignition system ESA, blast sensor (w/KCS), idle speed control system ISC.
Cylinder number: 4
Cylinder diameter X travel (mmXmm) : 78.7 X69.0
Air volume: 1.342
Compression ratio: 9.3
Idle speed (r/min) : 700 + / 50
Ignition timing: when idle speed on the check point in the first 10 + 2 ° (T terminal connected)
Air inlet air intake (mm) : 0.02 + + 0.05
(cold) exhaust (mm) : 0.03 + + 0.05
Rated power (kW/r/min) (NET) 63/6000
Maximum torque (N.m/r/min) (NET) 110/5200 plus or minus 200
Total load minimum fuel consumption (g/kW. H) is less than 280
The fuel (SH0041) closed-loop control engine for fuel plate no. 90 (SH0041) must use unleaded petrol.
Lubrication: pressure and splash compound
Oil specification: SAE 10w-30
API quality level: above SG level
Engine oil capacity (L) : 3.5 (dry filling)
Cooling mode: forced circulation is cold
Engine quality (Kg) : 111 or minus 2 (no starter, no water, no water, no running speed, clutch)
External dimensions (long X wide X height) (mmXmmXmm) : 670X589X644
Idle emission CO (%) is less than or equal to 2.5
HC (PPM) 600 or less
The second chapter mainly examines the project and the adjustment parameters
Generator, water pump belt tightness: 98N pressure, new belt deflection 7 ~ 9mm, used belt deflection 11.5 ~ 13.5.
Valve clearance (mm) : intake 0.02 + / - 0.05
(in the cold) the exhaust gas is 0.03 + + 0.05
Spark plug gap (mm) : 0.7 to 1.0
Idle speed (r/min) : 700 + 50
Ignition timing: idle speed (speed to 700 + 50 r/min), the top dead center in the first 10 + 2 ° (T terminal connected).
Em
您可能关注的文档
- (万科)住宅设计统一技术措施(建筑)(Unified technical measures for residential design (construction)).doc
- (建筑工程)第1章3(Chapter 1, 3).doc
- (新版)收缩膜热收缩膜生产制备工艺及应用专利技术光盘((new) shrink film shrinkage film production preparation process and application of patented technology compact disc).doc
- -平面旋转LED点阵套件-电子制作(- plane rotating LED lattice kit - electronic production).doc
- 001世界十大宫殿(001 the world's ten palaces).doc
- 0.8QQ手挡驾驶全攻略(0.8 QQ hand in the driver overall strategy).doc
- 002机械挖土施工工艺(Construction technology of mechanical excavation).doc
- 002作图题(黄冈市物理中考题调考题汇编)(002 graph (a compilation of examination questions in the physics of huanggang)).doc
- 008年石家庄市第二十八中学初三年级一模考试(In 008 shijiazhuang no.28 middle school, the first third grade a module examination).doc
- 005机械回填土施工工艺(Construction technology of mechanical backfill soil).doc
最近下载
- 【培训课件】财务管理工作中存在的问题和解决措施.ppt VIP
- 《针刺伤预防与处理》团体标准解读与实践PPT课件.pptx VIP
- 碳素、活性炭生产加工项目环评报告书.pdf VIP
- 《曹刿论战》第2课时示范公开课教学PPT课件【统编人教版九年级语文下册】.pptx
- (含图)原神家具负载表及计算器2.0.5.4.xlsx
- 【培训课件】财务管理与集团内部控制.ppt VIP
- DB50T 632-2015 火灾高危单位消防安全评估规程.pdf VIP
- 长庆油田公司第一采气厂地面产能建设工程 竣工资料编制办法.pdf
- AI能力融入职业院校教师数字素养培养的路径研究.docx VIP
- SB_T 11094-2014中药材仓储管理规范.pdf
文档评论(0)