- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
作业范例(Homework paradigm)
作业范例(Homework paradigm)
Steel - concrete composite flat girder integral building bearing performance
Test report
Single:
Graduate students:
Lead teacher:
Vice supervisor:
Time:
Test floor design calculation
1. Purpose of test
As a new type of building form, the composite flat beams have been widely used in Europe, especially in northern Europe. However, due to its short time, relevant research results are limited. In addition, because the structure form in Europe, the past relevant studies are mostly limited in terms of vertical bearing performance and fireproof performance, but our country is in an earthquake-prone countries, still need to adopt the new floor form in our country to this floor levels in the form of bearing performance and seismic performance for further study.
The purpose of this experiment is as follows:
1. The overall performance of the buildings self-vibration frequency and space (without floor load and normal use of floor load);
2. The stiffness and deformation under the vertical load bearing of the whole floor, the stress distribution of the floor slab (the beam of the middle and the side of the two sides and the rib);
Deformation under horizontal load, stress distribution and hysteresis performance;
Based on the experimental results, the effective width of composite flat beam and the frame model for designing the calculation are put forward.
Two. Research object
The object of this study is the whole building cover of the steel - concrete deep rib composite flat beam, which has two spans, the total plane size is 6m x 12m, and the height of the floor is 3 meters, and the foot ruler is designed, as shown in fig.1.
FIG. 1 overall layout of the study subjects
In the building span, a secondary beam is set, the main beam and the column are just connected, the secondary beam is connected with the main beam, the bottom structure is shown in figure 2, the concrete rib is arranged in the direction perpendicular to the secondary beam.
Figure 2 shows the b
您可能关注的文档
- 丝杠机械加工工艺设计说明书(Design instruction manual of screw machining process).doc
- 丝瓜络《中国药典》(Silk gourd Chinese pharmacopoeia).doc
- 丝网印刷中常见问题解答(A common problem solution in silkscreen printing).doc
- 两次调气门方法(Two valve control methods).doc
- 两阶段算法求解线性规划问题(运筹学实验)(Two-stage algorithm for solving linear programming problems (operational research experiment)).doc
- 严密性试验方法及标准(Strict test methods and standards).doc
- 个人2003年个人工作总结(Personal 2003 personal work summary).doc
- 个人的发展与公司的关系(Personal development is related to the company).doc
- 个板块龙头股(A plate leading stock).doc
- 中医十大名方(Top 10 Chinese medicine practitioners).doc
文档评论(0)