- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
动力电缆(Power cable)
动力电缆(Power cable)
50 pairs of 2 * 2.5 mm2 telephone lines
The way of wiring in electrical design construction drawings:
SR: lay along the steel wire slot
BE: lay along the roof or across the roof
CLE: lay along the column or across the column
WE: laying along the wall
CE: laying on the ceiling or ceiling
ACE: laying in the ceiling of a person
BC: hidden in the beam
CLC: hidden in the column
WC: dark laying in the wall
CC: dark laying in the ceiling
ACC: dark laying in a ceiling that cannot be entered
FC: dark laying in the ground
SCE: the ceiling shall be laid in a metal tube
One, the conduit says
Sc-welded steel pipe
MT - wire and tube
PC - PVC plastic hard pipe
Fpc-flame retardant plastic hard tube
CT - bridge
MR wire slot
M - wire
Cp-metal hose
PRPR
RC - galvanized steel pipe
Two, the way the wire is laid out
The DB - buried
TC - in cable trench
BC - dark applied in the beam
CLC - dark applied to the column
WC - dark on the wall
CE - laying at the ceiling
CC - dark applied to the ceiling
SCE - ceiling mounted
F - floor and floor
The SR - along the wire
BE - along the roof, beam
WE - along the wall
3. The installation mode of lamps and lanterns
CS - chain hanging
DS - hanger
W - wall mounting
C - top absorption
R - embedded
S - bracket
CL - post
Along the steel wire slot: SR
Along the roof or across the roof: BE
Column or cross column: CLE
Welding steel pipe laying: SC
Installation of wire tube: MT
Hard plastic pipe laying: PC
Wear flame retardant semi-rigid PVC pipe laying: FPC
Cable bridge: CT
Wire slot laying: MR
Plastic wire slot laying: PR
Laying of wire rope: M
Wear polyvinyl chloride plastic corrugated wire pipe laying: KPC
Wear metal hose: CP
Directly buried: DB
Cable trench laying: TC
The marking of the wire laying part
Edge or span beam (roof) laying: AB
Applied to the beam: BC
Laying along or straddling: AC
Dark laying in the column: CLC
Laying along the wall: WS
Dark laying in the wall: WC
Laying on the ceiling or panel: CE
Hidden in roofing or roof: C
您可能关注的文档
- 会计基础题(Accounting basics).doc
- 传Siri联管理合创始人兼CEO离职 其他高管留任苹果(The company's co-founder and CEO left other executives to stay in apple).doc
- 会计继续教育(Accounting continues education).doc
- 伊是清涟独映我心—也谈徐志摩、林徽因的爱情(Yi is the qing dynasty unique to my heart - also talk about xu zhimo, Lin huiyin's love).doc
- 传感器原理及应用(Principle and application of sensors).doc
- 传感器知识点(sensors).doc
- 传统昆剧《十五贯》剧情赏析(The traditional kunqu opera 15 years is a good story).doc
- 以Windows为操作平台(Take Windows as an operating platform).doc
- 传递函数(The transfer function).doc
- 传统现代——中国设计何去何从(Traditional modern -- China's design future).doc
文档评论(0)