网站大量收购独家精品文档,联系QQ:2885784924

北京SOHO临电施工组织设计(Design of electric construction organization in Beijing SOHO).doc

北京SOHO临电施工组织设计(Design of electric construction organization in Beijing SOHO).doc

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
北京SOHO临电施工组织设计(Design of electric construction organization in Beijing SOHO)

北京SOHO临电施工组织设计(Design of electric construction organization in Beijing SOHO) If the time of youth is spent in idle youth, the memory of the years will be a sad tragedy. Where there are more weeds, there are fewer crops. There is less wisdom in empty talk. Even if there are no flowers on the road, I can enjoy the desolation. The design of the electric construction organization in Beijing SOHO is designed. Txt33 learns to be tolerant, which means growing up, and the trees can absorb more of the sun and moon, and expand and thrive and become more mature. Endurance is a kind of persistence that does not show the dew of the mountain. It is a fortitude that is not afraid of the wind. It is an untuitously uncalled loyalty. directory Volume 1 overview 2 2. Overall arrangement of temporary electricity in volume 2 The 3rd volume of the live electrical arrangement 2 Chapter 1 buried 2 Chapter 2 electric box set 3 Chapter 3 electric box protection shed production 3 Chapter 4 electric box installation measures 3 Chapter 5. The box protection shed shall be set standard 3 Chapter 6 introduces seven circuits from the distribution room, 4 4. Schedule 4 of equipment power for site construction Volume 5 site electrical equipment (power calculation) 7 Chapter 1 the total electricity consumption of the construction site is 7 Chapter 2 circuit power wire calculation 8 Volume 6 construction technology, safety fire protection measures 13 Chapter 1 construction technology requires 13 Chapter 2 safety fire prevention measures 15 Chapter 3 safety electricity measures 15 Article 7 the responsibility system for the on-site electricians post is 16 Volume 1 overview of engineering Beijing SOHO modern city is located at the entrance of changan avenue, which is a building area of 220,000 square meters, with a height of 128 meters, which is the landmark building of the modern city campus. According to the construction site temporary electrical safety requirements of technical specification JGJ46-88,

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档