后张法简支箱梁预应力施工工艺(The prestress construction technology of the post-tensioned box girder).doc
- 1、本文档共24页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
后张法简支箱梁预应力施工工艺(The prestress construction technology of the post-tensioned box girder)
后张法简支箱梁预应力施工工艺(The prestress construction technology of the post-tensioned box girder)
The prestress construction technology of the post-tensioned box girder
China railway 19 bureau group fifth engineering co. LTD. Xinxiang girder field
Keywords: three control, strength, elasto, age, control stress, tension, periodic calibration, periodic calibration, before use
Abstract: after the construction of the prestress construction of the box girder with the latter, the required tensioning equipment includes oil pumps, jacks and 0.25 class anti-shock oil pressure meters. The raw materials are used in a 1 x 7-15.2-1860mpa type low relaxation steel strand. According to the process construction of prestressed construction process, pull rod, clear hole, steel strand processing and production, steel strand wire transfer and so on. The prestressing stress is performed in the three stages of pre-tensioning, the initial tension and the final tension, and the pre-tensioned three control: when the concrete reaches 35.5 MPa, the pre-tensioning can be carried out. When the strength meets the design requirements of 43.5 MPa, the initial tensioning can be carried out. According to the situation, the preliminary and early tensile can be carried out simultaneously, and the precast and the first tensioning can be carried out with the die tensioning. When the concrete strength reaches 53.5 MPa and the elastic modulus reaches 35.5 GPa, the age is greater than 10 days. During the tensioning process, the prestressed values are mainly based on the oil gauge reading, and the elongation value is supplemented, and the three concentric, two synchronization is achieved. Prestressed equipment to do: periodic verification (jack use more than 1 months or 200 times), regular calibration (hydraulic table by collision or oil leakage, oil pointer cannot be returned to the zero point) and before using the check (tensioning, determine if the hydraulic table and jack is properly matched; make jack empty 2-3 ti
您可能关注的文档
- 加工中心编程(Machining center programming).doc
- 加工工艺要求(Processing requirements).doc
- 加快WinXP启动速度的六种办法(Six ways to speed up the startup of WinXP).doc
- 加强入党积极分子教育培养工作的意见和建议(To strengthen the views and Suggestions on the training of education).doc
- 加强城市设计 提高城市发展质量(We will strengthen urban design to improve the quality of urban development).doc
- 加快内蒙古城镇化进程的思路和对策(The thought and countermeasure of speeding up urbanization in Inner Mongolia).doc
- 加气混凝土砌块墙体施工质量控制要点(Construction quality control points of reinforced concrete block wall).doc
- 加速度的瞬时变化问题(Instantaneous change in acceleration).doc
- 动力工程(Power engineering).doc
- 动力电缆(Power cable).doc
文档评论(0)