网站大量收购闲置独家精品文档,联系QQ:2885784924

向莆铁路雪峰山出口隧道监控量测总结(A summary of the monitoring measurement of the tunnel of xuefeng mountain in the mountainous area).doc

向莆铁路雪峰山出口隧道监控量测总结(A summary of the monitoring measurement of the tunnel of xuefeng mountain in the mountainous area).doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
向莆铁路雪峰山出口隧道监控量测总结(A summary of the monitoring measurement of the tunnel of xuefeng mountain in the mountainous area)

向莆铁路雪峰山出口隧道监控量测总结(A summary of the monitoring measurement of the tunnel of xuefeng mountain in the mountainous area) A summary of the monitoring measurement of the tunnel of xuefeng mountain in the mountainous area Zheng liubin zhang shuping zhu bin (China railway tunnel share new construction of the railway FJ - 2) Pick to: currently, the design idea of railway tunnel is: safety, environmental protection, as little damage as possible the original landform, tunnel generally follow the early in night out, so the import and export of the tunnel buried depth is shallow. In order to ensure the safety of the project, the quality is reliable and the monitoring measurement is an important work in the construction. This article elaborated the new two of achieving high speed railway to xuefeng mountain tunnel monitoring measurement for measuring method, to master the dynamic of the surrounding rock and supporting working status, comprehensive analysis of monitoring, so as to adjust the tunnel support scheme, guarantee the stability of surrounding rock and construction safety. Keywords: monitoring measurement, arch settlement, horizontal convergence, surface subsidence, total station, level, and ruler 1 project overview The snow peak mountain tunnel is located in northwest fujian province, through the peak of xufeng mountain. The import is located on the outskirts of the town of zhuo county, which is located in the village of shigang, shaoxian county. The tunnel adopts double hole single line, the inlet length of the left line tunnel is DK300 + 850, the inlet mileage of the right channel tunnel is YDK300 + 850, the exit mileage of the left line tunnel is DK318 + 692, and the exit mileage of the right channel is YDK318 + 676. The left line tunnel is 17,842 meters long and the right line tunnel is 17826 meters long. The tunnel is 948 meters deep. The longitudinal slope of the tunnel is a character slope, with a maximum of 6 ‰. Exporter of xuefeng mountain tunnel surface for the

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档