网站大量收购独家精品文档,联系QQ:2885784924

启动炉化水运行规程(The operation procedure of the boiler is started).doc

启动炉化水运行规程(The operation procedure of the boiler is started).doc

  1. 1、本文档共31页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
启动炉化水运行规程(The operation procedure of the boiler is started)

启动炉化水运行规程(The operation procedure of the boiler is started) 10. Start the operation procedure of the boilers 1. Operation procedure of softening water system 1.1 overview The softening water treatment system mainly reduces the hardness of the water and intercepts the suspended mechanical impurities to meet the requirements of the priming furnace. The system includes softening complete sets of equipment, regenerating complete sets of equipment, salt liquid pump, softening water pump, softening water tank and resin loading and unloading trolley. System process: water supply? Sodium ion exchanger? Softening water tank? Softener water pump - start boiler deaerator 2 soften water treatment system equipment specification The serial number equipment Name type and specification unit quantity remark Sodium ion exchanger 1 Q = 80 t/h H001 Φ 1800 mm x 1200 mm 3 out of the water for the mother pipe, the water for the porous plate water cap type, counter-current regeneration. Demineralized water tank 2 V = 200 m3 Φ 6480 mm 1 lined with epoxy resin 3 softened water pump hz50-200 Q = 30-60m3 / h = 0.50-0.45m stage 3 motor Y160M2-2 N = 15kw 4 soluble salt tanks DN900 2 5 salt tank DN600 1 6 salt liquid pump hz32-125 Q = 7.2 m3 / h = 0.16 m 2 motor y80z-2 N = 1.1 kw 1.3 operation and precautions 1.3.1 pre-launch inspection A) all valves of the standby sodium bed are closed and the meter is equipped with the conditions. B) the drains are unblocked. C) motor, water pump, water tank, pipe and valve are in standby mode. D) pressure of water supply tube is 0.2-0.6mpa. 1.3.2 the start, operation and stop of sodium bed 1.3.2.1 flushing pipeline: sodium bed backwashing drainage door open, and went into the watergate, flush the water line to drainage water quality transparent no mechanical impurities, sodium bed into the watergate, backwashing drainage door (only equipment full stop is started again after use). 1.3.2.2 normal washing: open the air door of the sodium bed, enter the water gate

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档