电力电缆入地推广研究课件.ppt

  1. 1、本文档共74页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
- * - The opportunity of underground cabling in the period of Beijing Olympic games Market potential Problems and solving strategy - * - During the Olympic construction period, underground cabling in Beijing brings a huge copper consumption potential about 30,000-50,000 tons more than 100KM roads reconstruction will match the demands of overhead cable construction within 16 districts and 2 suburbs, in the following 5 years, there will be more than 500KM roads. 2002-2008,The budget of Beijing electric power construction will be 36 billion Yuan . Within this budget, the underground cabling and other basic electric power establishment will occupy 3 billion Yuan/per year. 200KM backbone road Underground cabling in major branch road 20,000 tons Above 30,000 tons? Forth part——Beijing - * - According to the road construction plan: copper potential of the backbone roads (200 KM) charged by the municipal government will reach:12,042-24,083 tons picture:one corner of Beijing south-west second ring road which was reconstructed in 2002 Forth part——Beijing Forecasting hypothesis: cable section: 676.5mm 2 (according to Sinotrust data of power supply companies investigation) copper density: 8.9g/cm3 cable spreading density: 10-20 bars/cable tunnel (according to Sinotrust data of power supply companies investigation) - * - According to Beijing roads reconstruction plan, potential copper consumption of overhead cable reconstruction the copper potential of urban roads construction is :33,318 tons 海淀区 Forth part——Beijing - * - According to the data of Beijing power supply bureau,the length of electric power cable used in Beijing now is 4,583KM,but within forth ring roads(the city central areas) , overhead cable of 380V still has 3,000KM potential,and 10KV’s has 2,000KM Except the new added roads,only the underground cabling of low voltage will consume 33,318 tons copper.(assumed that the area of cable section is 676.5mm2 ) 5000KM overhead cable are not buried with

文档评论(0)

00625 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档