网站大量收购独家精品文档,联系QQ:2885784924

工程项目建设施工进度计划格式(Format of construction schedule for engineering projects).doc

工程项目建设施工进度计划格式(Format of construction schedule for engineering projects).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程项目建设施工进度计划格式(Format of construction schedule for engineering projects) Milepost schedule (important milestones period) the name of the project completion time schedule milepost plan plan 2. Note: image......... The main construction strength. 3.5. 2011 Annual Plan Analysis of 3.6. impact or potential impact analysis and preventive measures of time factor 3.7. in 2011 plans to complete the investment plan of annex 2.2011 years to build the project schedule for the content and format of the 1. 2.2010 year project to build the project construction progress summary 2.1. 2010 progress 2.2. 2010 XX company (or complete the power plant) project preparatory summary number phase of the project work plan completion time the actual completion time: 1234: Note: 3.2011 years project planning schedule 3.1. 2011 project plans to build a 3.2. XX in 2011 (or power plant) project construction plan summary number phase of the project work plan completion time: Note 1234:: 3.3. the important and key control Arrange project plan and 3.4. impact or potential impact factors of project preparatory work progress analysis and Countermeasures of annex 3.2011 of the annual investment plan table reporting unit (unit chapter): unit: million project name or budget execution estimate to 10 years in December a total investment of 2011 after the annual investment plan of capital structure in the use of funds totaling 1 quarter in the 2 quarter the 3 quarter of the 4 quarter of private capital loans and other design fees advance fee construction costs other * * * hydropower station construction project investment investment investment to install land acquisition equipment engineering investment project management costs other expenses investment immigration earthquake recovery reconstruction investment loan interest three total two * * * Note: the need for detailed investment plans that. Annex 4.2011 annual bidding schedule reporting unit (unit chapter): serial section name of the standard project c

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档