- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑经济(Construction economy)
建筑经济(Construction economy)
1., the actual cost of the construction project is the final price of the completed project
The 2. construction project cost is the sum of one-time costs of construction projects planned for reproduction of fixed assets and intangible assets and circulating fund of the corresponding
3., according to the nature of the construction project, classified as new projects, expansion projects and restoration projects
National investment projects, foreign investment projects, bank credit financing projects and self financing projects
4. project sequence: construction item individual item unit item subsection item sub item
5. a factory or a school is a construction project
6. the basic unit for organizing the construction work and preparing the construction drawing budget or construction budget is the sub project
7. the basis of price formation is value
8., from the construction process, the project cost is through construction to form the corresponding intangible assets of the one-time sum of expenses, and at the same time, it is also the price of the project itself
9., the tax and profits in the price (P=c+v+m) constitute the monetary performance of m in value
10. the price of the product is made up of two parts: production cost and profit, which include profit and tax
11. the production cost and circulation cost in the formation of price are the monetary performance of materialized labor (c) and living labor (V) in value
12. construction and installation cost is a kind of production field price
13., according to the characteristics of the project cost, the cost of the project has the characteristics of single, combination and multiple valuation
14., the construction project to carry out multiple valuation, the relationship between them is
Investment estimate and control design budget; the design budget estimate shall not exceed 10% of the investment estimate of the feasibility study report
Design budget estimate, control construction drawing
您可能关注的文档
- 中原乡村会谱(Central Plains Village Association).doc
- 中原大学各系所介绍(Introduction by Department of Central Plains University).doc
- 中国人口在45万以上的城市一览(A list of cities with a population of over 450 thousand).doc
- 为什么(Why).doc
- 为奴十二年(Twelve years as a slave).doc
- 为人处世的五种人的五种方式(Five ways of dealing with five kinds of people).doc
- 为所有动物不受虐待(Be free from cruelty to all animals).doc
- 为孩子打造安全网 购买少儿保险的八大理和五大攻略(For children to build a safety net, buy children's Insurance eight, Dali and five major Raiders).doc
- 习作一按照自己的心愿设立一个节日(Exercise 1 set up a festival in accordance with your wishes).doc
- 乌盆计【后本】(一名奇冤报;一名定远县)(根据《戏考》第一册整理)2010年11月08日修正(Ukrainian basin plan [after this] (A rare injustice reported; one Dingyuan county) (according to the drama Book 08), revised on November 2010).doc
文档评论(0)