- 1、本文档共23页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建设流程(Construction process)
建设流程(Construction process)
I. establishment stage of project construction
Examination and approval department: development and Reform Commission (investment of under 100 million yuan project)
Application materials:
(1) 1 copies of the admission opinions;
(two) 1 photocopies of the business license of the company;
(three) apply for 1 copies of the project
(four) 1 copies of the project proposal
(five) project declaration disk 1
Approval content: project approval
Approval time limit: 2 days
Two, project approval phase of environmental protection
Approval department: Environmental Protection Bureau
Application materials:
(1) approval of the project 1 copies;
(two) 1 copies of the declaration form
Examination and approval content: Notice of environmental protection advice or record form
Approval time limit: 3 days
Three, site selection stage
Approval department: Planning Bureau
Application materials:
(1) 1 written applications for site selection;
(two) 1:500 present situation, topographic map, drawing and CD each 1
(three) land department, land ownership, or the identification of the land red line 1
(four) 1 copies of the assessment report and approval opinions of the geological hazard;
(five) the EIA opinions of the industry sector must be issued in 1 copies
(six) 1 copies of the approval plan of the Planning Commission
(seven) development qualification certificate (necessary for development unit);
Approval content: planning red line, construction site selection notice, construction project design conditions and requirements notice,
Approval time limit: 4 days
Four, the state-owned land use right transfer contract and state-owned land use warrants
1, approval department: Land Bureau
Application materials:
(1) 3 copies of the approval of the NDRC project;
(two) 3 copies of the design conditions, requirements notices and drawings of the planning and construction works;
(three) 3 copies of the agreement signed by the enterprise and the Administrative Committee;
(four) fea
您可能关注的文档
- 为什么(Why).doc
- 为奴十二年(Twelve years as a slave).doc
- 为人处世的五种人的五种方式(Five ways of dealing with five kinds of people).doc
- 为所有动物不受虐待(Be free from cruelty to all animals).doc
- 为孩子打造安全网 购买少儿保险的八大理和五大攻略(For children to build a safety net, buy children's Insurance eight, Dali and five major Raiders).doc
- 习作一按照自己的心愿设立一个节日(Exercise 1 set up a festival in accordance with your wishes).doc
- 乌盆计【后本】(一名奇冤报;一名定远县)(根据《戏考》第一册整理)2010年11月08日修正(Ukrainian basin plan [after this] (A rare injustice reported; one Dingyuan county) (according to the drama Book 08), revised on November 2010).doc
- 乌兰巴托见闻(Ulan Bator knowledge).doc
- 书家必携(They will bring).doc
- 书斋画室联(The study combined studio).doc
文档评论(0)