网站大量收购闲置独家精品文档,联系QQ:2885784924

电气安装施工规范(Code for electrical installation construction).doc

电气安装施工规范(Code for electrical installation construction).doc

  1. 1、本文档共30页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电气安装施工规范(Code for electrical installation construction)

电气安装施工规范(Code for electrical installation construction) GB 50259 - 96 1 General Provisions 1.0.1 in order to ensure the quality of electrical lighting equipment construction, to promote technological progress, to ensure safe operation, the development of this specification. 1.0.2 This specification applies to the construction and acceptance of electrical lighting installation works in buildings and structures. Installation of the 1.0.3 electrical lighting device shall be carried out in accordance with approved design. When the design is modified, the original design unit shall agree to do so. 1.0.4 equipment, equipment and its transportation and storage shall comply with the relevant provisions of the current national standards; when the equipment and equipment have special requirements, it should comply with the provisions of technical documents. When the 1.0.5 equipment and equipment arrive at the construction site, they shall be inspected according to the following requirements: 1.0.5.1 technical documents should be complete. 1.0.5.2 models, specifications and appearance quality shall comply with the design requirements and the provisions of this specification. The safety technical measures in the construction of 1.0.6 shall comply with the present standards and the current national standards and technical documents of the products. Before the construction of 1.0.7 electrical lighting installations, the construction works shall meet the following requirements: 1.0.7.1 the installation of lamps and lanterns to impede the template, scaffolding should be removed; 1.0.7.2 ceiling, walls and other plastering work should be completed, the ground cleaning work should be completed. After the construction of the 1.0.8 electrical lighting device, the damaged parts of the building and structure caused by the construction shall be repaired and completed. 1.0.9 when installing the electric lighting device in the masonry structure, should use the embedded hook, bolts, screws,

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档