- 1、本文档共28页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
监控施工方案1(Monitor construction plan 1)
监控施工方案1(Monitor construction plan 1)
A part of the construction organization plan
Section 1 Engineering Overview
The second section construction organization deployment and management measures
I. preparation of documents and data
The basic project file
When accepting engineering tasks, the project department should read and verify the following information so as to facilitate rational organization and careful construction, improve work efficiency, ensure project quality and create quality projects.
(1) project design drawings (system program, system front layout map, system schematics, system equipment list) and instructions
Notes on books and monitoring systems;
(2) project contract documents;
(3) construction schedule of civil works;
(4) the management documents of the construction units and the supervision units on the construction units;
(5) the relevant documents before entering the construction monitoring project summary;
Two, the establishment of project management organizations:
According to the actual situation of the factory monitoring system in the Yellow River group, the company established the project management organization as the basic condition of project management.
1, set the form
Establish a management team with the project manager as the responsible person.
2 、 the composition of the project manager department:
3, the project team composition
3.1 、 project manager department personnel form:
Project manager:
Person in charge of embedment technology:
Embedded tester:
Equipment installation:
Debug:
Commissioning maintenance:
Three, labor preparation
Management style:
(1) management of subcontracting work:
After carefully signing and executing contracts, and incorporated into the entire construction project management control system, the timely discovery and negotiation to solve the problem, ensure that the overall goal of the project implementation.
You must retain the direct authority, discipline is not suitable for the work of the staff, the proje
您可能关注的文档
- 审计定性与处罚3-金融保险部分(Audit qualitative and penalties 3- financial insurance section).doc
- 客观的评价西工大(Objective evaluation of West University).doc
- 客户端ocx控件开发说明(Client ocx control development instructions).doc
- 室内色彩设计的一般规律(General rules of interior color design).doc
- 室内活动方案(Indoor activity program).doc
- 如何培养小学生的运算能力(How to train pupils' computing ability).doc
- 室内设计材料总汇1(Interior design materials confluence 1).doc
- 室内设计风格与元素(Interior design style and elements).doc
- 家庭自酿葡萄酒(Family brewed Wine).doc
- 家具尺寸(Furniture size).doc
- 2024-2025学年人教版小学数学四年级下册教学计划及进度表.docx
- 2024-2025学年北师大版小学数学二年级下册教学计划及进度表.docx
- 2024-2025学年人教版小学数学五年级下册教学计划及进度表.docx
- 2024-2025学年人教大同版(2024)小学英语三年级下册教学计划.docx
- 2024-2025学年人教精通版(三起)(2024)小学英语三年级下册教学计划.docx
- 2024-2025学年统编版初中道德与法治八年级下册教学计划及进度表.docx
- 2024-2025学年统编版(2024)初中道德与法治七年级下册教学计划及进度表.docx
- 2023-2024学年上海黄埔区中考二模综合测试(物理部分)试卷及答案.pdf
- 2024-2025学年外研版(三起)(2024)小学英语三年级下册教学计划及进度表.docx
- 2025届北京市北京第四中学高三冲刺模拟数学试卷含解析.doc
最近下载
- 统编版(新教材)一年级下册语文第二单元《热爱中国共产党》第1课时教学课件.pptx VIP
- SAE AMS8660-2018 硅酮化合物代号S-736.pdf
- 2024年统编版(高中)政治新教材必修3政治与法治第一次月考试卷 2套汇编(含答案解析).pdf
- “技能兴威”第一届威海市职业技能大赛“无人机操控”赛项实施方案.docx
- 2024年阳泉职业技术学院单招职业技能测试题库及答案(必刷).docx VIP
- 武汉市2025届高中毕业生二月调研考试(二调)数学试卷(含答案详解).pdf
- 《基于哈佛分析框架的房地产公司财务研究国内外文献综述5100字》.pdf VIP
- 新12J01图集 工程作法.pdf
- 《热爱中国共产党》课件-2024-2025学年统编版语文一年级下册第二单元阅读1.pptx VIP
- 详解2025《增值税法》课件.ppt
文档评论(0)