网站大量收购独家精品文档,联系QQ:2885784924

监理员考试试题(二)(Examination questions for supervisor (two)).doc

监理员考试试题(二)(Examination questions for supervisor (two)).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
监理员考试试题(二)(Examination questions for supervisor (two))

监理员考试试题(二)(Examination questions for supervisor (two)) Examination questions for supervisor (two) First, individual choice questions 1. arbitration of project construction contract disputes shall be arbitrated by the Arbitration Commission selected by both parties. 2. the construction contract with FIDIC contract conditions shall be controlled by the supervision of the provisional amount within the total contract price. 3. the assignment of the contract is subject to change. 4. additional work in the supervision contract refers to the supervision work which is increased due to the obstruction or delay of the supervision work due to the non supervision party. 5. design work began before the principal advance payment to the Contractors design a grant stipulated in the contract for the deposit, in the process of implementing the contract stage payment, (each stage of payment are not allowed to deduct the deposit). 6. for a partys breach of contract caused by the other 50 thousand yuan actual damages, in accordance with the contract agreement method to calculate the liquidated damages amount is 30 thousand yuan, the party in breach shall pay to the other compensation amount (5 yuan). 7. a contract of the deposit is 2000 yuan, and the contract is terminated due to the forced acceptance side breach, he shall return to each other for the amount of (4000) 8.FIDIC contract conditions require the owner to pay the contracted works within 28 days after receiving the interim payment certificate from the supervising engineer. 9. the parties concerned require an economic contract to be changed and an agreement shall be reached through consultation between the two parties. However, the loss of the other party due to the change of the contract shall be borne by the party responsible for the change (B.). 10. because of the rationalization proposal put forward by the supervision institution, the owner has obtained actual economic benefits, and shall be rewarded in accordance with the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档