- 1、本文档共24页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
装修简单流程汇总(Simple decoration, Flow Summary)
装修简单流程汇总(Simple decoration, Flow Summary)
Decoration all process and simple description worth reading (plagiarism + summary, for your reference)
I. wall and top paint (interior wall coating)
1, remove the old plaster (new original putty layer or good quality can not eradicate the grassroots, to save the old wall such as sand; the real texture is loose should eliminate all 1:3 5--10mm thick cement mortar).
2, brush interface agent again.
3, wall cracks and joints with crack bandage (insulation wall, light partition wall should be filled with sand, paste dacron cloth or full nail plasterboard as crack processing).
4, batch scraping 821 putty, 2---3 times for wall leveling.
5, sandpaper polished, local rest, and then polished.
6, remove dirt.
7. Roll or coat the interior wall paint 2---3 times.
Two, wallpaper, wall covering
1, remove the old plaster (new original putty layer or good quality can not eradicate the grassroots, to save the old wall such as sand; the real texture is loose should eliminate all 1:3 5--10mm thick cement mortar).
2, brush interface agent again.
3, wall cracks and joints with crack bandage (insulation wall, light partition wall should be filled with sand, paste dacron cloth or full nail plasterboard as crack processing).
4, batch scraping 821 putty, 2---3 times for wall leveling.
5, sandpaper polished, local rest, and then polished.
6, remove dirt.
7, and then brush varnish again.
8, with professional wallpaper glue plus latex paste.
Three wall tiles
1, the eradication of the original wall tiles (if required).
2, 1:3 cement mortar, smooth 10mm thickness.
3, wall chiseling or napping treatment.
4, the wall pop-up horizontal and vertical lines.
5, the water does not bubble to tile with 1:2 cement mortar paste (positive corner edge angle bump).
6. White cement or joint sealant.
Four, insulation wall
1, wall drill, nail into the wood.
2, wall fixed 30 * 40 pine keel.
3. Adding polystyrene board, fixing cement pressure plate or gypsum board.
Five, li
您可能关注的文档
- 微机原理课程设计(Course design of Microcomputer Principle).doc
- 微观经济学练习题23txt(Microeconomics exercises 23txt).doc
- 微观经济答案(Microeconomic answer).doc
- 德国联邦银行货币政策工具的改革与完善(Reform and perfection of German Federal Bank's monetary policy tools).doc
- 心电图机的原理及结构(The principle and structure of electrocardiograph).doc
- 必修二地理总结(Compulsory two geographical summary).doc
- 微观经济学复习(Microeconomics review).doc
- 心理测量(Psychometrics).doc
- 开发话术(Word development).doc
- 必修二地理(Compulsory two geography).doc
最近下载
- GZ100 移动应用设计与开发赛项规程-2024年全国职业院校技能大赛双数年拟设赛项规程 .pdf
- 部编版小学五年级下册语文二单元教材分析解读主讲课件.pptx
- 演讲与口才PPT全套完整教学课件.pptx
- 标准地层颜色.pdf
- 《中华茶艺》——课件:宋代饮茶艺术+点茶实操.pptx VIP
- 精品孕妇可以用取暖器吗取暖器有没有辐射.doc VIP
- JGJ168-2009 建筑外墙清洗维护技术规程.docx
- T_CSCS 041-2023 工业钢结构检测与鉴定技术标准.docx
- 2015-2023年苏州卫生职业技术学院高职单招(数学/语文/英语)历年参考题库带答案解析.docx
- 部队手机管理网络安全教育PPT课件.pptx VIP
文档评论(0)