网站大量收购独家精品文档,联系QQ:2885784924

十年后的建筑施工心得(Construction experience after ten years).doc

十年后的建筑施工心得(Construction experience after ten years).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
十年后的建筑施工心得(Construction experience after ten years)

十年后的建筑施工心得(Construction experience after ten years) Pronto, graduation has been working for ten years. Graduation in 1999, when the real estate construction industry downturn, in our case, not to find an employer to receive, it is difficult to find a place to practice. Its even more difficult to find jobs at home. Out of the country, anything can be done. Did the work force (migrant workers), the building had hotel waiter, pantry staff, sold newspapers, put off stall, even palmistry is a. 2001, the real estate gradually pick up, began to do a measurement site in the line, and began to do something for others, two months later, their independence. Its been like this for a year. In 2002, began to be a technician (technical leader), worked for 6 years. In 2008, the project leader was responsible for site management of the eighteen thousand residential projects. This year, technical and settlement work has been done so far. Always wanted to write something, today muster up the courage to put their so-called experience written out. Level is limited, it is inevitable that there are problems or even mistakes, but also hope that users correct me, in order to make common progress. In 2001, the first line was to work with others, or to give a hand to others, or line tail. Two months later, began to independent line. Summarize the following points: First, the use of equipment to extremely skilled. Remember at that time, theodolite or the kind of old-fashioned, the need for the middle level, and then the kind of re leveling. Many of the crew will be in minutes or even minutes. I was in the office for two nights and managed to complete the erection in less than half a minute, when I was a bit of a show. Two, upstairs, line must bring drawings. Some of the staff in the office of the drawings of the elevation, axis size back, remember in mind, back to the upstairs line, looks very smart, but also very easy to go wrong. At that time, one of the crew members picked up the walls of t

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档