网站大量收购独家精品文档,联系QQ:2885784924

四川省水利水电建筑工程预算定额的石方工程说明(Sichuan Province Water Conservancy and hydropower construction engineering budget quota description of rock engineering).doc

四川省水利水电建筑工程预算定额的石方工程说明(Sichuan Province Water Conservancy and hydropower construction engineering budget quota description of rock engineering).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
四川省水利水电建筑工程预算定额的石方工程说明(Sichuan Province Water Conservancy and hydropower construction engineering budget quota description of rock engineering)

四川省水利水电建筑工程预算定额的石方工程说明(Sichuan Province Water Conservancy and hydropower construction engineering budget quota description of rock engineering) Sichuan Province Water Conservancy and hydropower construction engineering budget quota of second chapter of rock engineering Explain First, this chapter includes general stonework, protective layer, groove, pit excavation, tunnel, shaft, shaft, presplitting blasting excavation of rock and gravel transport quota 77 day. Two. The units of measurement in this chapter, except those indicated, are in accordance with the natural square. Three, general rock excavation quota, applicable to the general excavation of rock engineering; trench bottom width of over 7 meters; is more than 160 square metres of rock pit excavation; angle less than or equal to 20 degrees, the excavation thickness greater than 5 meters (perpendicular to the design of the average thickness of excavation of the slope rock). Four, the general slope excavation excavation quota, applicable to the design of angle greater than 20 degrees and the thickness of 5 meters of stone. Five and the protective layer of rock excavation quota, suitable for the design shall not allow the destruction of the rock structure of rock excavation engineering, such as dam foundation, dam foundation, Taiwan power plant foundation, stilling basin, corridor connecting engineering rock thickness calculation, according to the requirements of the design. Six, groove rock excavation quota, for a long strip of rock bottom width is less than or equal to 7 meters, or both sides of the vertical slope excavation engineering. Such as channel, intercepting trough, drainage ditch, geosyncline and so on. The bottom width of more than 7m in general rock excavation calculation, a protective layer and a protective layer, according to the general rock proportion calculation. Seven, the slope excavation quota for groove rock, groove rock on the bottom of the channel axis and horizontal angle greater than 2

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档