四川省水利水电建筑工程预算定额第四章混凝土工程说明(Sichuan Province Water Conservancy and hydropower construction project budget quota fourth chapter concrete engineering explanation).doc
- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
四川省水利水电建筑工程预算定额第四章混凝土工程说明(Sichuan Province Water Conservancy and hydropower construction project budget quota fourth chapter concrete engineering explanation)
四川省水利水电建筑工程预算定额第四章混凝土工程说明(Sichuan Province Water Conservancy and hydropower construction project budget quota fourth chapter concrete engineering explanation)
Sichuan Province Water Conservancy and hydropower construction engineering budget quota, the fourth chapter of concrete engineering
Explain
First, this chapter includes cast-in-place concrete, RCC, precast concrete, asphalt concrete, such as a total of 79 fixed sections.
Two, concrete quota measurement units, in addition to those who are marked, are buildings or structures of the finished product entity
Three. Cast-in-place concrete, RCC and precast concrete parts include precast concrete members, suspension (safety), steel fabrication and installation, concrete mixing, transportation and other quotas. Applicable to the dam, sluice, ship, building, tunnel, shaft, channel, etc. various kinds of aqueduct hydraulic structures.
Four, quota work content
Cast in situ concrete include: punching (chisel) wool, flushing, clearing, laying cement mortar, filling pouring, vibrating, maintenance, surface transportation and auxiliary work.
Roller compacted concrete include: scouring, flushing, clearing, laying cement mortar, unwinding, rolling, cutting, maintenance, transportation and auxiliary work.
Precast concrete prefabricated field includes: washing, cleaning, batching, mixing, pouring, vibrating, maintenance, installation, dismantling, template production, repair, transport concrete prefabricated field, material transportation and auxiliary work, precast floor hanging moving and stacking.
Five, all kinds of cast-in-place concrete dam type quota, not including the overflow surface, pier, parapet, bridge and highway bridge, etc..
Six, the cast in place concrete quota, except for those who do not contain template production, installation, demolition, trimming.
Seven. This chapter four _24 to four _29 is precast concrete quota. For the other must be on-site and no corresponding fixed precast concrete members, four _22 can
您可能关注的文档
- 兔场日常管理要求(Tuchang daily management requirements).doc
- 兔子的语言表达(The language of rabbits).doc
- 俗话说的好,可俗话又说!(As the saying goes, the saying goes!).doc
- 势—营销之魂(The soul of marketing).doc
- 兔子的饮食(Rabbit diet).doc
- 十一、托盘(3分)(Eleven, tray (3 points)).doc
- 十个相似图片有哪些信誉好的足球投注网站网站(Ten similar picture search sites).doc
- 十二星座上班族大学生美女服装搭配方案 menglinzhu2012知道hashanjin(Twelve constellations, office workers, college students, beauty clothing collocation program, menglinzhu2012 know hashanjin).doc
- 十佳团委书记优秀事迹材料(Top ten league secretary, outstanding deeds material).doc
- 十六进制表示颜色的用法(Sixteen decimal means the use of colors).doc
- 畜牧养殖与畜产品的应用-基础知识技术管理销售.pptx
- 2025年福州科技职业技术学院单招职业技能考试题库及参考答案.docx
- 2025年四川交通职业技术学院单招职业技能考试题库学生专用.docx
- 2025年烟台汽车工程职业学院单招职业技能测试题库标准卷.docx
- 2025年西安明德理工学院单招职业倾向性考试题库参考答案.docx
- 2025年贵州护理职业技术学院单招职业技能考试题库完整版.docx
- 2025年宝鸡职业技术学院单招综合素质考试题库带答案.docx
- 2025年厦门安防科技职业学院单招职业技能测试题库标准卷.docx
- 2025年江苏建筑职业技术学院单招职业技能测试题库完美版.docx
- 2025年保险职业学院单招职业倾向性测试题库必考题.docx
文档评论(0)