网站大量收购独家精品文档,联系QQ:2885784924

四川省水利水电建筑工程预算定额的总说明(General description of budget quota for water conservancy and hydropower construction projects in Sichuan).doc

四川省水利水电建筑工程预算定额的总说明(General description of budget quota for water conservancy and hydropower construction projects in Sichuan).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
四川省水利水电建筑工程预算定额的总说明(General description of budget quota for water conservancy and hydropower construction projects in Sichuan)

四川省水利水电建筑工程预算定额的总说明(General description of budget quota for water conservancy and hydropower construction projects in Sichuan) General description of Sichuan Province Water Conservancy and hydropower construction engineering budget quota, General description One, Sichuan Province Water Conservancy and hydropower construction project budget quota (hereinafter referred to as the norm), divided into earthworks, rock engineering, masonry engineering, concrete engineering, template engineering, material engineering, gravel grouting and anchorage engineering, drilling engineering and other eight chapters. Two. This quota applies to the construction and expansion of medium-sized and small-sized water conservancy and hydropower projects in our province, which can be used as a reference for compiling the budget estimate, bidding tender price and bidding price of these projects. Three. This quota applies to projects at elevations less than or equal to 2000m. The elevation of the area above 2000m is calculated according to the elevation elevation of the site of the water control project and the prescribed adjustment coefficient. The elevation to the elevation of dam or sluice dam or sluice dam as the standard, not the bottom elevation as a water inlet. For the diversion type water conservancy and hydropower projects, such as the elevation difference between the head and the tail is greater than 500m, two different adjustment factors should be selected respectively. Table 1 adjustment coefficient of artificial and mechanical quota in plateau area Elevation 2000~2500 (m), manual adjustment 1.10, mechanical adjustment 1.25 Elevation 2500~3000 (m), manual adjustment 1.15, mechanical adjustment 1.35 Elevation 3000~3500 (m), manual adjustment 1.2, mechanical adjustment 1.45 Elevation 3500~4000 (m), manual adjustment 1.25, mechanical adjustment 1.55 Elevation 4000~4500 (m), manual adjustment 1.3, mechanical adjustment 1.65 Elevation 4500~5000 (m), manual adjustment 1.35, mechanical a

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档