网站大量收购闲置独家精品文档,联系QQ:2885784924

土方回填施工方案(Earthwork backfill construction scheme).doc

土方回填施工方案(Earthwork backfill construction scheme).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土方回填施工方案(Earthwork backfill construction scheme)

土方回填施工方案(Earthwork backfill construction scheme) Earthwork backfill construction scheme I. basis for compilation Construction drawing Code for acceptance of work quality of foundations and foundations Unified standard for quality acceptance of Construction Engineering Technical specification for safety operation of construction machinery Two 、 construction process According to the site, two times the first time to backfill, backfill foundation beam top elevation, second earthwork backfill to the design elevation, packing back to more than 0.97 star, construction of stratified soil, mainly due to excavation pile in the field the two phase of the project site, can take the original soil backfill. Vibration compactor and ramming ramming machine with solid foundation pit wall surface, the local edge with artificial ramming. As the construction needs, the upper structure is a high number of formwork, the first backfill to the top of the foundation beam, after the completion of the structure, and then backfill to the design elevation. The construction time of the foundation beam is relatively short, while the backfill is protected, and the excavator and dump truck can not directly crush the ground beam. 1, process flow: 2, fill the former should be the foundation pit (groove), pipe ditch and other debris to clean up; must clean up to the foundation trench backfill, bottom elevation, loose soil, mortar, stone fall clean up. 3 water, test of backfill rate is within the control range, such as high water content, can be used to loose, dry or mixed into dry soil and other measures; in case of backfill soil moisture content is low, the water wetting and other measures in advance. 4, backfill should be stratified spreading and compaction. The soil thickness of each layer shall be determined according to the soil quality, compactness requirements and the performance of the machines and tools. General ramming machine thickness of soil layers is 200 ~ 250mm; artificial ramming does

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档