土方回填施工方案(Earthwork backfill construction scheme)
土方回填施工方案(Earthwork backfill construction scheme)
Earthwork backfill construction scheme
I. basis for compilation
Construction drawing
Code for acceptance of work quality of foundations and foundations
Unified standard for quality acceptance of Construction Engineering
Technical specification for safety operation of construction machinery
Two 、 construction process
According to the site, two times the first time to backfill, backfill foundation beam top elevation, second earthwork backfill to the design elevation, packing back to more than 0.97 star, construction of stratified soil, mainly due to excavation pile in the field the two phase of the project site, can take the original soil backfill. Vibration compactor and ramming ramming machine with solid foundation pit wall surface, the local edge with artificial ramming.
As the construction needs, the upper structure is a high number of formwork, the first backfill to the top of the foundation beam, after the completion of the structure, and then backfill to the design elevation. The construction time of the foundation beam is relatively short, while the backfill is protected, and the excavator and dump truck can not directly crush the ground beam.
1, process flow:
2, fill the former should be the foundation pit (groove), pipe ditch and other debris to clean up; must clean up to the foundation trench backfill, bottom elevation, loose soil, mortar, stone fall clean up.
3 water, test of backfill rate is within the control range, such as high water content, can be used to loose, dry or mixed into dry soil and other measures; in case of backfill soil moisture content is low, the water wetting and other measures in advance.
4, backfill should be stratified spreading and compaction. The soil thickness of each layer shall be determined according to the soil quality, compactness requirements and the performance of the machines and tools. General ramming machine thickness of soil layers is 200 ~ 250mm; artificial ramming does
您可能关注的文档
- 台湾地理气候资源(Taiwan climate resources).doc
- 台钓打窝(Fishing wo).doc
- 吃在三明(Eating in Sanming).doc
- 吃货大食堂配方(Canteen chowhound recipe).doc
- 各国元首年薪排行榜大曝光(Annual salary list of heads of state exposure).doc
- 各国、地区货币中英文对照表(Chinese and regional currency in Chinese and English).doc
- 各国关税起征点(Tariff threshold by country).doc
- 各国标志性建筑物(Landmark buildings by country).doc
- 各国塑料发展(Plastic development by country).doc
- 各国货币名称中英对照(The names of the currencies are in Chinese and English).doc
最近下载
- 程序设计语言的形式语义习题答案解析.pdf
- 3.1.1+植物的根能吸收水和无机盐课件2024-2025学年济南版生物七年级下册.pptx VIP
- 2024年湖南环境生物职业技术学院单招职业技能测试题库及答案解析.docx VIP
- icu早期康复治疗课件.pptx
- GB50028和GB55009燃气应用部分详细解读PPT.pptx
- 中考历史复习高频考点归类复习提纲(含5套卷).pdf
- 四年级计算题大全(列竖式计算-可打印).pdf
- 2020年陕西科技大学招聘辅导员试题及答案.docx
- 聚丙烯塑料的改性及应用.pdf VIP
- (苏教版)数学三年级上册寒假作业计算题“天天练”习题卡,含30份题组,附参考答案.doc
文档评论(0)