网站大量收购闲置独家精品文档,联系QQ:2885784924

土木工程《工程管理》测评(Civil Engineering project management evaluation).doc

土木工程《工程管理》测评(Civil Engineering project management evaluation).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土木工程《工程管理》测评(Civil Engineering project management evaluation)

土木工程《工程管理》测评(Civil Engineering project management evaluation) Single question: 30 channels, 2 points per channel, total score of 60 1. of the following causes of claims, a particular risk factor is (war). 2., the international project contract project (contract management) is the core of the whole project management. The 3. construction project subject to tender according to law, the tenderer to make necessary clarifications or amendments on bidding party has been issued, in the tender documents should be the deadline for submission of bid documents at least (15) days before the issue. 4. a project uses our country construction contract demonstration text, in the contract implementation process, the contractor proposed to be advantageous to the construction engineering change, and obtained engineers approval, the original design unit has provided the corresponding change blueprint for this. The expenses incurred therefrom shall be borne by the employer. 5., after a project earthquake, traffic congestion in this area, price increases, so that contractors can not afford to pay, so the contractor can make claims to the owners (fees). 6., the installation of a project, the two sides agreed in the contract need to test, according to the construction contract model text of the provisions, if already has linkage no-load test conditions, the organization test run should be (the employer). 7. the contract between the parties to a project shall be stipulated in the contract, and the Contractor shall be responsible for the design of the project, and shall be responsible for the purchase of the materials and equipment, and the contract shall belong to (the general contract for construction projects). 8., the dispute resolution of the international project contract should be first (negotiated) 9. the validity period of the performance contract of the construction contract starts from the date of commencement of the works. 10. contract control measures, excluding (legal measures)

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档