地大《工程概预算与招投标》在线作业一(Big project budget and bidding online homework)
地大《工程概预算与招投标》在线作业一(Big project budget and bidding online homework)
14 spring autumn spring 13 13 large engineering budget and bidding online homework one or two
Total score: 100 test time: -
Radio examination
A multiple-choice question
Judgment question
Radio examination questions (7 questions, 28 points)
1. the project construction unit shall apply to the state planning department for the establishment of the project, or when the state makes a decision on the proposed project, it shall be compiled ().
A. design budget
B. investment estimate
C. revised estimates
D. design budget
Full marks: 4
2., the actual cost of construction projects is ().
A. final account price
B. contract price
Price tag in C.
D. completion settlement price
Full marks: 4
3. the final accounts of the capital construction projects shall be reflected in the actual expenditures incurred from the preparation to the final acceptance.
A. civil engineering
B. single project
C. whole project
D. part of the project
Full marks: 4
4. the following items are not direct fees.
A. labor costs
B. construction machinery use fee
C. temporary facilities fee
D. two handling charges
Full marks: 4
5. the contents of final accounts shall not include ().
A. completion settlement report
B. completion settlement
C. final account report
Comparative analysis of D. project cost
Full marks: 4
6., in the construction project of the three stage design, it must be prepared in the technical design stage.
A. total budget estimate
B. construction drawing budget
C. revised total budget
D. construction budget
Full marks: 4
7., when the general civil engineering projects or small general-purpose factories and other projects, in the preliminary design documents are not yet complete, but also at the stage of the program, unable to calculate the amount of engineering, you can adopt () the preparation of construction projects estimates.
A. budget quota
B. budget estimate
C. similar projects pre (decision)
D. or more is wrong
Full marks:
您可能关注的文档
- 合肥方言(Hefei dialect).doc
- 吉林儿女(Sons and daughters of Jilin).doc
- 吉大《计算机系统结构》在线作业一(Kyrgyzstan computer architecture online homework).doc
- 吉德康先进制造技术是企业发展的动力(Ji Dekang advanced manufacturing technology is the driving force of enterprise development).doc
- 合资打造中国光伏产业龙头(Joint venture to build China's photovoltaic industry leader).doc
- 吉林大学农学部(Faculty of agriculture, Jilin University).doc
- 吉林大学杰出校友!(Jilin University distinguished alumni!).doc
- 吉林市铁建丽苑小区工程(Railway construction project of Jilin City Lai District).doc
- 吉林省二级资质企业(Jilin two qualification enterprises).doc
- 吉林省玉米宽窄行密植机械栽培技术(Mechanical planting cultivation technology of maize row in Jilin Province).doc
文档评论(0)