- 1、本文档共12页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
坐标有关的(Coordinate related)
坐标有关的(Coordinate related)
The main function of coordinates in a general plan is to calibrate the relative positions of the buildings in the plan and the relative positions of the buildings or reference objects other than the plan. The coordinates used in the general building floor plan are two types of coordinate system and measurement coordinate system, all of which belong to the plane coordinate system. They are expressed in the form of square grid. The coordinate of architecture is generally self formulated by the designers of the coordinate system, its origin is determined by the makers, the two shafts are respectively expressed in A and B; the measurement coordinate system is associated with the national or local coordinate system, the two shafts are respectively expressed in X and Y. If there are two coordinate systems in the general plan, the conversion formula between them is usually given. The method of reading the coordinate in the building master plan is the same as that of the plane coordinate system in mathematics. If you know the coordinates of the four corners of a building (generally given the diagonal of two or three points), you can calculate the length, width, or distance from the other buildings through the calculation of the triangle relation. But one thing to pay special attention to is to measure the axis of the coordinate system. The X axis is north-south and pointing north. The Y axis is east-west and pointing east. That is to say in the plan under the north south axis in the horizontal direction is Y axis, the axis perpendicular to the direction of the X axis, dont read the wrong, wrong. Coordinate the total construction plans in the Yellow Sea have a uniform elevation. Said reading method is that each coordinates (X, Y) according to the marked shaft. Take any point as the origin (usually from the lower left corner of the corner as the origin of the coordinate origin) set for corresponding values minus the origin (0,0) coordinate with other
您可能关注的文档
- 同人游戏三国志赵云传完整攻略(Zhao Yun, the Three Kingdoms chronicles of the game).doc
- 同步带简述(A brief introduction of synchronous belt).doc
- 同步带(Synchronous belt).doc
- 同济大学城规考研科目(Tongji University graduate school entrance examination).doc
- 同济考研历年规划原理试题汇总(Tongji graduate entrance examination over the years planning principles, Questions Summary).doc
- 后差速器(rear differential).doc
- 后浪互联网精品资料_积分卡网络推广创意及执行方案(After the wave of Internet products _ integral card network to promote the creative and execution plan).doc
- 后张法预应力施工控制要点及计算(Construction control points and calculation of post tensioning method).doc
- 向蔡燕萍学习创业策划(Learn business plan from Cai Yanping).doc
- 君子兰(Clivia).doc
- 垃圾的分类回收(Garbage sorting and recycling).doc
- 垫江二中学校领导贪污(Dianjiang No.2 Middle School Leadership corruption).doc
- 垮掉的一代 the beat generation(垮掉的一代垮掉的一代).doc
- 城市住宅区规划(Urban residential district planning).doc
- 城市园林绿化企业资质标准(Urban landscaping enterprise qualification standard).doc
- 城市园林绿化企业资质等级标准(Grade standard of urban landscaping Enterprises).doc
- 城市市区交通拥堵的现状、原因及对策(The status quo, causes and Countermeasures of traffic congestion in urban areas).doc
- 城市广场宜经营特色...(City Square should be operating characteristics...).doc
- 城市总体规划(Urban master planning).doc
- 城市燃气管道敷设安全管控探究(Study on safety control of city gas pipeline laying).doc
最近下载
- 2022春教科版科学小学六年级下册全册完整课件.pptx
- 佐敦_涂装施工工艺.pdf VIP
- 山西杏花村汾酒集团有限责任公司整理招聘80人历年高频考题难、易错点模拟试题附带答案题库大全附参考答案.docx VIP
- 山西杏花村汾酒集团有限责任公司2024年招聘1人历年高频考题难、易错点模拟试题附带答案【黄金题型】.docx VIP
- 教科版四年级科学下册 种子的传播 .pptx VIP
- 二手机回收协议书.docx
- 肱骨外科颈骨折中医临床路径表单.pdf
- 2025年卫生专业技术资格考试风湿与临床免疫学(中级313)基础知识重点难点题库详解.docx VIP
- 小气候学试题库..doc VIP
- 人大代表培训学习材料.docx VIP
文档评论(0)