网站大量收购独家精品文档,联系QQ:2885784924

基层信息平台(Grassroots information platform).doc

基层信息平台(Grassroots information platform).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
基层信息平台(Grassroots information platform)

基层信息平台(Grassroots information platform) The basic information platform of Xinjin Deng Shuang Zhen village of Wenshan County Home village situation overview, policies and regulations, grassroots public convenience services, communication, interactive supervision, management, service development, October 10, 2013, Thursday user name: password: Current position: Grassroots open to village community notification notice Xinjin County Wenshan village Deng Shuang Zhen uyu Temple Road Construction Project 2013-09-22 source: Wenshan village : small font background color: red green and blue print. shut down Release date: September 15, 2013 1, tender conditions One point one The tender Deng Shuang Zhen uyu Temple Road construction project by the Xinjin County Deng Shuang Zhen Wenshan village collective proposal voted by the Village Council decided to discuss the construction of the project owner for the Xinjin County Wenshan Deng Shuang Zhen Village Committee, the source of funds for the construction of special funds of rural public services and the financial subsidies. The bidding agency: Xinjin County Wenshan Deng Shuang Zhen Village committee. The project already has the tender conditions, and the project is now open for public bidding. 1.2 the tender Xinjin County Wenshan village Deng Shuang Zhen uyu Temple Road construction project, the village self tender. 2 、 project survey and bidding scope 2.1 project location: Xinjin County Deng Shuang Zhen Village area of Wenshan 2.2 construction scale 1, pavement irrigation: 3000 meters long, 5 meters wide, 0.2 meters thick, using C25 concrete watering 2, subgrade leveling: 2500 meters long, 5 meters wide 3, subgrade excavation: 1500 meters long, 2 meters wide, 0.5 meters high 4, subgrade backfill: 1500 meters long, 0.5 meters high, 2 meters wide, sand clamp stone backfill 5: 10, and culvert diameter of 6 meters, 0.5 meters each 6, subgrade compaction: roller compaction 7, drainage ditch: 3500 meters long, 0.2 meters wide, 0.2 me

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档