网站大量收购独家精品文档,联系QQ:2885784924

塔吊安全操作规程(Safety operation regulation of tower crane).doc

塔吊安全操作规程(Safety operation regulation of tower crane).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
塔吊安全操作规程(Safety operation regulation of tower crane)

塔吊安全操作规程(Safety operation regulation of tower crane) Safety operation regulation of tower crane (1) the track foundation or concrete foundation of the tower crane must be checked by design and checked before acceptance. The slope and drainage facilities should be built around the foundation, and a safe distance should be kept between the foundation pit and the foundation pit. (2) the tower crane foundation soil bearing capacity must be strictly according to the original provisions or comply with the tower: medium for 8 ~ 12t/ square meters, the heavy tower is 12 ~ 16t/ square meters. (3) the disassembly and assembly of the tower crane must be carried out by the professional team which has obtained the qualification certificate of disassembly and assembly issued by the administrative department of construction, and the technical and security personnel should be present in the process of dismounting. (4) and personnel should wear safety protection products, should fasten the safety belt when working at height, familiar with and implement disassembly process and operation rules. (5) the lifting, installation and disassembly shall not be carried out when the wind reaches over four. Check the connection of all parts of the hydraulic jacking system before jacking up. No swing arm and other operations are prohibited during jacking. (6) after the tower crane is installed, the technical inspection and adjustment of the whole machine shall be carried out, and shall be ready for delivery after passing the inspection of the whole stage and the whole machine. In the case of no load, the deviation of the verticality between the tower and the ground shall not exceed 4/1000. The motor and hydraulic parts of the tower crane shall be carried out in accordance with the relevant provisions concerning the motor and hydraulic device. (7) the metal structure of the tower crane, the track and all the metal enclosures of the electric equipment shall have reliable earthing devices, and the g

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档