- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
塔式起重机(塔吊)是怎样加高的(How is tower crane (tower crane) raised)
塔式起重机(塔吊)是怎样加高的(How is tower crane (tower crane) raised)
How is tower crane (tower crane) raised?
1 litre standard section
In the process of hoisting should be less than 4 under the wind, lifting before the upper slewing mechanism is in braking state, does not allow a rotary motion (lifting process is strictly prohibited starting rotation and lifting operation).
During lifting, the tower crane shall not be hoisted except for its own installation. If the hydraulic jacking system is abnormal, the jacking shall be stopped immediately, and the oil cylinder shall be retracted to check whether there is any lifting obstacle or the oil system fault.
1.1 preparations before the top rise
A, according to the provisions of the pumping station oil to the hydraulic pump tank refueling; and press the test operation, the cylinder no-load operation 4~6 times, no abnormalities after the power off, stand-by.
B, clean up all the standard section, at the junction of butter in the upper end of standard section, will be the standard section used in lifting and lifting positions of the boom line, so that the tower crane in the top Festival add up is not necessary in the process of rotary mechanism, can make the lifting process and section the shortest time;
C, the lifting arm rotating top lifting sleeve frame in front of the balance arm in frame (rear jacking cylinder in the frame of the rear).
1.2 lifting operation (lifting device for falling off type)
A on the ground, first, four imported rollers are fixed on the four corners of the standard section of the tower, then the standard section is hoisted and placed on the extended platform frame.
B, remove the eight standard sections between the lower support and the standard section, the high-strength bolt, the pin at both ends of the jacking beam is pushed out and inserted into the round hole accurately. Make the jacking beam as close as possible to the tower, as far as the longitudinal axis of the cylinder is in the same plane. Start the h
您可能关注的文档
- 售后服务管理体系(After service management system).doc
- 售楼员应聘技巧(Sales staff application skills).doc
- 唯美爱情句子(Aestheticism love sentence).doc
- 商业会计核算的特点(Characteristics of business accounting).doc
- 唯美的50句情诗词(The 50 love poems of Aestheticism).doc
- 唯美、悲情的优美句子和古文诗句2(Beautiful and tragic beautiful sentences and Classical Verse 2).doc
- 商业区悬挑架(Business district cantilever).doc
- 商业地产价值分析(Value analysis of commercial real estate).doc
- 商业智能之思考(Thinking about business intelligence).doc
- 商业建筑的设计方法讨论(Discussion on the design methods of commercial buildings).doc
最近下载
- 内蒙古乌尼特矿业有限责任公司乌尼特煤矿接续生产环境影响报告书.doc
- 特种设备-维护保养记录(叉车-电动托盘堆垛车).docx
- 《多边形的内角和》 示范教学PPT课件【初中数学人教版八年级上册】.pptx
- 紧密型县域医疗卫生共同体消毒供应中心运营指南(2020年版 医联体建设).docx
- 泵站运行考试(高级)习题库(第1部分).pdf
- 挡土墙计算理正岩土(“挡土墙”文档)共21张.pptx
- XXXX生态风景区智慧景区项目施工组织方案及对策.pdf
- 陈培勋平湖秋月五线谱钢琴谱.pdf
- 可爱的中国教案第10课可爱的中国第十课同心共筑中国梦.docx
- 2024《S市乡镇幼儿教师职业幸福感问卷调研分析报告》9700字.docx VIP
文档评论(0)