网站大量收购独家精品文档,联系QQ:2885784924

复垦流程(Reclamation process).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
复垦流程(Reclamation process)

复垦流程(Reclamation process) The main part of the implementation of the construction land reclamation project is the Township Peoples government and subdistrict offices, which can be carried out in an administrative village and can be implemented in more than two administrative villages. (1) conditions for project establishment; 1, reclamation projects must meet the overall land use planning and town planning, not in the overall land use planning for urban construction land area and village construction planning area; 2, the proposed reclamation plots of land in the project before the land use change survey of the 1:10000 standard points The land use map must be labeled as construction land; 3, a single block area should be no less than 0.5 acres. (two) declaration procedure 1, the project by the township (street) apply to the District Land Resources Bureau, the District Land Resources Bureau received the project application, the organization of personnel is reconnaissance, preliminary confirmation of the scope of land reclamation; 2, the project is located in the township (street) organization mapping and planning work, the preparation of project feasibility reports (including the increase of cultivated land area, resettlement, project budget and fund raising plan after reclamation), the district land and Resources Bureau will work together with relevant departments to demonstrate the feasibility of the project; 3, after the demonstration, the township streets provide relevant information, the district land and resources branch to fill in XX province built. The land consolidation (reclamation) project shall be presented in the form of reports, and shall sign the opinions and report them to the higher land and resources department for approval; 4, after the approval of the project, the Township Peoples government and subdistrict offices shall be in accordance with the relevant provisions and planning and design requirements Organize and implement, and collect the relat

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档