- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外墙抹灰裂缝的控制的好办法(A good way to control cracks in exterior plastering)
外墙抹灰裂缝的控制的好办法(A good way to control cracks in exterior plastering)
A good way to control cracks in exterior plastering
This post was moved from the industrial and civil buildings by black magic carp to this area (2007-04-21)
In order to effectively prevent and control cracks, through the analysis of various types of cracks and the causes, targeted prevention and treatment, will achieve good results. To this end, in addition to the strict implementation of national and local standards in the design and construction, we should also take practical measures according to the characteristics of the cracks.
The main measures can be considered from two aspects: first, active prevention, and two initiative. The so-called protection, which will be part of the deformation and additional stress release or reduce the wall produced by certain measures; and resistance, is through the design and construction measures to resist because of additional stress caused by the deformation of the wall. Only these two aspects of comprehensive consideration, can achieve better results.
I. prevention and control measures during construction
1. exterior wall structure
(1) block all the holes in the wall. Matrix holes and uneven place, first with 1:3 cement mortar leveling, such as leveling layer is too thick (greater than 10mm), should be layered and leveling.
(2) block good foot, hand eye. There are data analysis, exterior wall cracks, feet, hand hole at the original hole shape split, such cracks accounted for about 45% - 65%. The specific control measures are: blocking eye should be 2h in the wall before plastering should be filled with water soaked cotton silk hole in 30min after removal of cotton yarn, the bottom of the hole covered with mortar, then block masonry water soaked into the hole, both sides are using vertical seam pointing trowel filled with mortar, until is dense check.
2. ensure the construction quality of brick masonry and leveling layer
(1) the outer wall of the joint betwee
您可能关注的文档
- 商法作业(Commercial law operation).doc
- 商超渠道及特征(Channels and characteristics of business channels).doc
- 商铺橱窗设计中须注意的几个问题(Some problems needing attention in the design of shop window).doc
- 商鞅变法之我见(My view on Shang Yang's political reform).doc
- 商标24类(24 Categories of trademarks).doc
- 啤酒厂(Brewery).doc
- 善仁装饰——上海别墅设计公司装修知识介绍(Good benevolence decoration -- introduction of decoration knowledge of Shanghai villa design company).doc
- 喜达屋酒店管理集团(Starwood).doc
- 喜阳植物(Flowering plant).doc
- 喝普洱茶要注意什么(What should I pay attention to drinking Puer tea).doc
- 2025年中央党史和文献研究院所属企业招聘笔试参考题库含答案解析.pdf
- 2025年陕西长安电力华中发电有限公司招聘笔试参考题库含答案解析.pdf
- 2025年河南省汤阴县城乡发展投资集团招聘笔试参考题库含答案解析.pdf
- 2025年北京国贸东孚工程科技有限公司招聘笔试参考题库含答案解析.pdf
- 2025年广西北海市银海区直属国有企业招聘笔试参考题库含答案解析.pdf
- 2025年浙商银行总行客户服务中心社会招聘笔试参考题库含答案解析.pdf
- 2025年中国太平洋人寿成都中心支公司招聘笔试参考题库含答案解析.pdf
- 2025年浙江温州机场机务维修工程公司招聘笔试参考题库含答案解析.pdf
- 2025年贵州黔西南州贞丰县佰家福超市招聘笔试参考题库含答案解析.pdf
- 电视广告:变迁与挑战-揭秘传统媒体在新媒体冲击下的生存之道.pptx
最近下载
- DB4403_T 77-2024 电动汽车充电安全监控平台数据采集规范.docx
- 基层网络舆情监测工作的实践与思考.docx VIP
- 加强政治机关建设提升机关工作质量.pptx VIP
- 作业3:《windows服务器基础配置与局域网组建》工学一体化课程学习任务设计.docx VIP
- 某小区供配电系统设计本科生毕业设计论文.doc VIP
- DG_TJ 08-2242-2023 民用建筑外窗应用技术标准.docx
- 胶带简介介绍.ppt
- 文化创意产品设计开发合同.doc VIP
- 瓦工:高级瓦工(强化练习).docx VIP
- 作业11:《windows服务器基础配置与局域网组建》工学一体化课程教学进度计划表.docx VIP
文档评论(0)