网站大量收购独家精品文档,联系QQ:2885784924

外墙抹灰裂缝的控制的好办法(A good way to control cracks in exterior plastering).doc

外墙抹灰裂缝的控制的好办法(A good way to control cracks in exterior plastering).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
外墙抹灰裂缝的控制的好办法(A good way to control cracks in exterior plastering)

外墙抹灰裂缝的控制的好办法(A good way to control cracks in exterior plastering) A good way to control cracks in exterior plastering This post was moved from the industrial and civil buildings by black magic carp to this area (2007-04-21) In order to effectively prevent and control cracks, through the analysis of various types of cracks and the causes, targeted prevention and treatment, will achieve good results. To this end, in addition to the strict implementation of national and local standards in the design and construction, we should also take practical measures according to the characteristics of the cracks. The main measures can be considered from two aspects: first, active prevention, and two initiative. The so-called protection, which will be part of the deformation and additional stress release or reduce the wall produced by certain measures; and resistance, is through the design and construction measures to resist because of additional stress caused by the deformation of the wall. Only these two aspects of comprehensive consideration, can achieve better results. I. prevention and control measures during construction 1. exterior wall structure (1) block all the holes in the wall. Matrix holes and uneven place, first with 1:3 cement mortar leveling, such as leveling layer is too thick (greater than 10mm), should be layered and leveling. (2) block good foot, hand eye. There are data analysis, exterior wall cracks, feet, hand hole at the original hole shape split, such cracks accounted for about 45% - 65%. The specific control measures are: blocking eye should be 2h in the wall before plastering should be filled with water soaked cotton silk hole in 30min after removal of cotton yarn, the bottom of the hole covered with mortar, then block masonry water soaked into the hole, both sides are using vertical seam pointing trowel filled with mortar, until is dense check. 2. ensure the construction quality of brick masonry and leveling layer (1) the outer wall of the joint betwee

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档