大工10秋《建筑施工》在线作业1(Big work 10 autumn construction work online homework 1)
大工10秋《建筑施工》在线作业1(Big work 10 autumn construction work online homework 1)
Austrian Peng work 10 autumn construction online homework 1
First, radio questions (15 questions, 60 points) Score: 0
V
1. in most cases, a slope must be retained for excavation or filling. The slope is called ().
A. hydraulic gradient
Trench B.
C. earthwork slope
D. soil nailing wall support
The correct answer: C Full Score: 4 points: 0
2. the diameter of the excavated pile can not only meet the requirements of the design capacity, but also consider the requirements of construction operation, so the pile diameter is not appropriate.
A. is less than 800mm
B. is greater than 800mm
C. = 600mm
D. = 600mm
The correct answer: A Full Score: 4 points: 0
3. shrinkage pile, also called shrinkage pile, bottleneck pile, refers to a part of the pile, the diameter of the pile is reduced, and the shrinkage often appears in ().
A. saturated mucky soil
B. sand
C. silty sand
D. heavy silty clay
The correct answer: A Full Score: 4 points: 0
4., reinforced concrete precast pile should be in the design strength of concrete () can be hoisted.
A. 50%
B. 60%
C. 70%
D. 90%
Answer: C score: 4 points score: 5 underground continuous wall construction, when digging to the design elevation of tank cleaning, tank inspection after passing into the catheter is pressed into the water, the bottom mud will continue to dilute the self suction mud to relative density (so far).
A. 0.8~1.0 below
B. 1.1~1.2 below
C. 1.1~1.2 above
D. more than 1.3
The correct answer: B Full Score: 4 points: 0
6. () applies to the condition that there is no underground water in the depth of the hole, and the hole is not taken directly when the hole is formed, and the soil is directly taken into the hole.
A. slurry retaining wall bored pile
B. casing drilling
C. bored pile
D. explosion expanding hole
The correct answer: C Full Score: 4 points: 0
7. jet pump well point equipment precipitation depth up to () m, but its well point tube generally only 25~40
您可能关注的文档
- 四级词汇开头H(Level Four vocabulary begins with H).doc
- 四金和五险一金(Four and five social insurance and one housing fund).doc
- 四风存在的问题及整改措施(Four wind problems and corrective measures).doc
- 因势利导 引领xx民营经济全面起飞(Lead the XX private economy to take full advantage of the situation).doc
- 回力标的空气动力学原理(The principle of aerodynamics of the boomerang).doc
- 四级计分方式(Four stage scoring system).doc
- 因特斯英语学习法(English learning method).doc
- 团结和依靠群众建设新西南(一九五O年七月一日)(Unite and rely on the masses to build the new Southwest (195 July 1st O)).doc
- 团章知识竞赛(Constitution knowledge contest).doc
- 团组织生活策划书(Mission planning).doc
- 2025年安徽工商职业学院单招职业技能测试题库带答案(典型题).docx
- 2025年洛阳科技职业学院单招职业技能测试题库带答案(新).docx
- 2025年荆门职业学院单招职业技能测试题库及答案(易错题).docx
- 2025年宣化科技职业学院单招职业技能测试题库(精练).docx
- 2025年包头职业技术学院单招职业技能测试题库带答案(新).docx
- 2025年江西工商职业技术学院单招职业技能测试题库带答案(精练).docx
- 2025年黑龙江农业经济职业学院单招职业技能测试题库精编.docx
- 2025年山东艺术设计职业学院单招职业技能测试题库带答案(基础题).docx
- 2025年陕西工商职业学院单招职业技能测试题库带答案(突破训练).docx
- 2025年承德护理职业学院单招职业技能测试题库【word】.docx
文档评论(0)