网站大量收购独家精品文档,联系QQ:2885784924

大工10秋《建筑施工》在线作业1(Big work 10 autumn construction work online homework 1).doc

大工10秋《建筑施工》在线作业1(Big work 10 autumn construction work online homework 1).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大工10秋《建筑施工》在线作业1(Big work 10 autumn construction work online homework 1)

大工10秋《建筑施工》在线作业1(Big work 10 autumn construction work online homework 1) Austrian Peng work 10 autumn construction online homework 1 First, radio questions (15 questions, 60 points) Score: 0 V 1. in most cases, a slope must be retained for excavation or filling. The slope is called (). A. hydraulic gradient Trench B. C. earthwork slope D. soil nailing wall support The correct answer: C Full Score: 4 points: 0 2. the diameter of the excavated pile can not only meet the requirements of the design capacity, but also consider the requirements of construction operation, so the pile diameter is not appropriate. A. is less than 800mm B. is greater than 800mm C. = 600mm D. = 600mm The correct answer: A Full Score: 4 points: 0 3. shrinkage pile, also called shrinkage pile, bottleneck pile, refers to a part of the pile, the diameter of the pile is reduced, and the shrinkage often appears in (). A. saturated mucky soil B. sand C. silty sand D. heavy silty clay The correct answer: A Full Score: 4 points: 0 4., reinforced concrete precast pile should be in the design strength of concrete () can be hoisted. A. 50% B. 60% C. 70% D. 90% Answer: C score: 4 points score: 5 underground continuous wall construction, when digging to the design elevation of tank cleaning, tank inspection after passing into the catheter is pressed into the water, the bottom mud will continue to dilute the self suction mud to relative density (so far). A. 0.8~1.0 below B. 1.1~1.2 below C. 1.1~1.2 above D. more than 1.3 The correct answer: B Full Score: 4 points: 0 6. () applies to the condition that there is no underground water in the depth of the hole, and the hole is not taken directly when the hole is formed, and the soil is directly taken into the hole. A. slurry retaining wall bored pile B. casing drilling C. bored pile D. explosion expanding hole The correct answer: C Full Score: 4 points: 0 7. jet pump well point equipment precipitation depth up to () m, but its well point tube generally only 25~40

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档