大工15春《工程估价》在线作业2满分答案(Big work 15 spring, project evaluation online homework 2 full answer).doc
- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大工15春《工程估价》在线作业2满分答案(Big work 15 spring, project evaluation online homework 2 full answer)
大工15春《工程估价》在线作业2满分答案(Big work 15 spring, project evaluation online homework 2 full answer)
Work 15 spring project evaluation online homework 2
Multiple topics
First, radio questions (15 questions, 60 points)
1. in each of the following quotas, a set of reciprocal relations is ().
A. budget quota and budgetary estimate quota
B. budgetary estimate quota and labor quota
C. time quota and production quota
D. cost quota and construction quota
Developing options: C
2. labor consumption quota refers to the quantity standard for the completion of (or) labor consumption.
A. a certain number of qualified products
B. certain product quantities
C. unit investment quota
D. unit products
Developing options: A
3. the construction quota of the project can be classified according to the content of the consumption of the factors of production reflected in it.
A. construction quota, budget quota and budgetary estimate quota
B. construction quota, equipment installation quota, construction and installation project cost quota
C. labor consumption quota, mechanical consumption quota and material consumption quota;
D. budgetary estimate index, investment estimate index and budgetary estimate quota
Developing options: C
4. the quota established by the sub project of each section of a building or structure is ().
A. construction quota
B. budget quota
C. budget quota
D. budget estimate
Developing options: B
5., the milestone of the second stage of the reform of our countrys engineering quota pricing system is ().
Promulgation and implementation of the bidding law of the A.
B. regulates the price of the state
C. implements quantity price separation
Publication and implementation of D. standard for valuation of bill of quantities for construction projects
Developing options: D
6., a earthwork construction machinery cycle of the normal time is 2.2min, every cycle work 0.5 cubic meters of excavation, the duration of the work class is 8h, the normal use factor of machinery is 0.85. The earthwork
您可能关注的文档
- 团结演讲稿(Unity speech).doc
- 团队与研发(Team and R & D).doc
- 团队与群体有何区别(What is the difference between a team and a team).doc
- 团队协作及沟通 内容介绍(Introduction to team work and communication).doc
- 团队力量「5 1」性格融合后的「化学反应」(The chemical reaction after the fusion of team strength 51).doc
- 团队使命感建立(Team mission building).doc
- 团队动力,需要突破就事论事(Team motivation, need to break it).doc
- 团队合作心理游戏(Team psychology games).doc
- 团队发展过程概述(Team development process overview).doc
- 团队合作的作用(The role of teamwork).doc
文档评论(0)