大湖中心小学2010年学校安全工作专项检查自查情况汇总表(Central Plains primary school 2010 school safety special inspection self inspection summary sheet).doc
- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大湖中心小学2010年学校安全工作专项检查自查情况汇总表(Central Plains primary school 2010 school safety special inspection self inspection summary sheet)
大湖中心小学2010年学校安全工作专项检查自查情况汇总表(Central Plains primary school 2010 school safety special inspection self inspection summary sheet)
This article is contributed by 3bplt9o4gf
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
School security work special inspection, self-examination and self check situation summary table, Great Lakes Central Primary School in 2010, school safety work special inspection, self inspection summary sheet
Time: 2010-3-17
Serial number
School
Hidden danger
1. student dormitory network security closed, inconvenient evacuation of 2. students; single wall 289 meters; single painting, brick column spacing of 2.5 meters 3. teaching building, dormitory building no fire hydrant; 4. east wall houses built close to the wall; 5.s dirty and not standardized. 6.. The total power switch of the student stew rice is exposed. 1. dormitory compartment wall for the single wall; 2. single wall 155 meters; single painting, brick brick column spacing of 2.5 3. toilet single brick wall; wall brick toilet toilet monomer monomer wall; 4. the number of fire extinguishers. 1., grade three or four classrooms and dormitory walls are single wall; 2. teachers dormitory electricity aging; 3. single wall 249 meters, single painting, brick column spacing 2.5 meters. 4. student bathrooms and built in canteens for single wall; 5. toilets are single wall dangerous buildings. The toilet is a single wall dangerous building. Toilets are single wall dangerous buildings, 6. fire extinguishers are not enough.
Rectification opinion
1. proposed removal; 2. demolition and reconstruction; 3. increasing fire fighting facilities; 4. reporting the situation to the township government; 5. immediate refurbishment. 6. additional protective boxes are needed. 1. demolition and rehabilitation; 2. demolition and reconstruction; 3. demolition and reconstruction; 4. immediately additional 1. demolition
您可能关注的文档
- 团队发展过程概述(Team development process overview).doc
- 团队合作的作用(The role of teamwork).doc
- 团队合作的重要性(Importance of teamwork).doc
- 团队合作精彩小故事(Team work, wonderful little stories).doc
- 团队建立的五个发展阶段(Five stages of development of a team).doc
- 团队合作故事(Teamwork story).doc
- 团队建设中的叶公好龙现象(The construction of the team in yegonghaolong phenomenon).doc
- 团队建设方案(Team building program).doc
- 团队建设的12C法则(The 12C rule of team building).doc
- 团队名称和口号(Team name and slogan).doc
- 2025一重集团融创科技发展有限公司社会公开招聘8人笔试参考题库附带答案详解.pdf
- 实现可持续发展的工作计划.pptx
- 2025年云南省西双版纳傣族自治州单招职业适应性测试题库及完整答案1套.docx
- 2025年中考语文复习专题★★★句子的衔接与排序.pptx
- 2025年海口经济学院单招综合素质考试题库必威体育精装版.docx
- 《舞蹈解剖学》课件 第三章 骨.pptx
- 2025年医用X射线增强电视系统项目经济效益评估报告.docx
- 2025年四川电力职业技术学院单招综合素质考试题库含答案.docx
- 《舞蹈解剖学》课件 第十六章 儿童少年及女子舞蹈训练.pptx
- 2025年黄河交通学院单招职业倾向性考试题库一套.docx
文档评论(0)