- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大工10秋《建筑施工》在线作业2(Big work 10 autumn construction work online homework 2)
大工10秋《建筑施工》在线作业2(Big work 10 autumn construction work online homework 2)
Big work 10 autumn construction work online homework 2
First, radio questions (15 questions, 60 points) Score: 0
V
1. the strength of mortar is the cube test block with the side length of (mm), under the standard curing, the average compressive strength after (or) the age.
A. 50,14
B. 35,28
C. 60.8,21
D. 70.7,28
The correct answer: D Full Score: 4 points: 0
2. sliding formwork, the height of the formwork depends on the speed of sliding and the time required for the concrete to reach the strength of the die, and generally take () M.
A. 0.6~0.8
B. 0.8~1.0
C. 1.0~1.2
D. 1.2~1.4
The correct answer: C Full Score: 4 points: 0
3. the following preparations should not be made before concrete pouring is done.
A. good acceptance of concealed works
B. cleans mud and debris
C. apply moisture to dry cohesive soil
D. do vibrating compaction work
The correct answer: D full marks: 4 points: 4, site construction, brick wall daily height should not exceed () m; rainy days of construction, the daily masonry height should not exceed () M.
A. 1.4,1.6
B. 1.6,1.4
C. 1.2,1.8
D. 1.8,1.2
The correct answer: D Full Score: 4 points: 0
5. brick masonry, brick should be early () watering wet, so as not to brick excessive absorption of moisture in the mortar, and affect its bonding force.
A. 24 hours
B. 36 hours
C. 1~2 days
D. 3~4 days
The correct answer: C Full Score: 4 points: 0
6. the lifting height of the Longmen frame is generally () m, and the lifting weight is () t.
A. 15~30,0.6~1.0
B. 15~30,0.6~1.2
C. 20~30,0.8~1.0
D. 20~30,0.8~1.2
The correct answer: B Full Score: 4 points: 0
7. sintered common bricks are solid or porosity bricks made of clay, rock sheets, coal, stone and fly ash as raw materials.
A. is not greater than 15%
B. no less than 15%
C. is not greater than 12%
D. no less than 12%
The correct answer: A Full Score: 4 points: 0
8. the determination of water retention capacity of mortar is expressed by the deg
您可能关注的文档
- 团队合作精彩小故事(Team work, wonderful little stories).doc
- 团队建立的五个发展阶段(Five stages of development of a team).doc
- 团队合作故事(Teamwork story).doc
- 团队建设中的叶公好龙现象(The construction of the team in yegonghaolong phenomenon).doc
- 团队建设方案(Team building program).doc
- 团队建设的12C法则(The 12C rule of team building).doc
- 团队名称和口号(Team name and slogan).doc
- 团队建设的四戒(Four precepts of team building).doc
- 团队学习对绩效具有积极的影响作用(Team learning has a positive effect on Performance).doc
- 团队描述(Team description).doc
- 大良舞起顺德龙头(Daliang dance from Shunde tap).doc
- 大白菜winxp系统介绍(Introduction of Chinese cabbage WinXP system).doc
- 大芒果的一些gm命令和fm代码(Some GM commands and FM code for big mango).doc
- 大连三日游旅游攻略(Dalian three day tour guide).doc
- 天大15秋季《工程造价管理》在线作业二(Big 15 autumn project cost management online homework two).doc
- 天文望远镜选购技巧大放送(Astronomical telescope buying skills).doc
- 天正常见问题(FAQ).doc
- 天正建筑8.0小诀窍(8 tips for building a day).doc
- 大连轨道交通规划(Dalian rail transit planning).doc
- 天文基础(Astronomical basis).doc
文档评论(0)