网站大量收购独家精品文档,联系QQ:2885784924

安装期末a卷(Install the final a volume).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安装期末a卷(Install the final a volume)

安装期末a卷(Install the final a volume) Class name, student number 2009/2010 academic year second semester end Installation project budget and final examination questions A volume (closed volume) available calculator (08 (three special) project cost 1 or 2) Note: Please fill in the following answer sheet and fill in the blank. I. individual choice questions: (2 points per subject, total 20 points) 1, the non valuation material is also called (C). The answer is textbook P11 A. auxiliary material B. sporadic material C. main material D. turnover material 2, in listing setting, 02 of the item code 030212001001 represents (B). See the example solution P111 A. lamp installation engineering, B. electrical equipment installation engineering C. decoration project D. plumbing pipe installation works 3, the following does not belong to the fee is (D). The answer is textbook P40 A. pollution discharge fee B. quota determination fee C. dangerous operations, accident insurance, D., urban maintenance and construction tax 4, the tender control price is the bidding project (A) project cost. See example solution P16 A. limits the maximum B. limit to the minimum C. qualified bid D. limited bid 5, the sub item volume list should be used (B) valuation. See example solution P13 A. management plus profit B. comprehensive unit price C. autonomous bidding, D., base addition factor 6, according to the national tax law should be included in the cost of construction and installation costs, known as (C tax), see the textbook P42 A. fee B. comprehensive fee C. tax D. management 7, in the 08 list specification, C.2 electrical equipment installation works applies to (B) installation works. See textbook P93 A.10KV overhead power distribution equipment and transmission line distribution equipment and circuit below B.10KV C.10KV control equipment and low voltage electrical equipment, less than D.10KV electrical equipment 8, 08 list valuation standard stipulated in, the water supply pipeline engineering q

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档