安装电地暖和水地暖应该注意什么(What should be paid attention to when installing electric floor heating and water heating).doc
- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安装电地暖和水地暖应该注意什么(What should be paid attention to when installing electric floor heating and water heating)
安装电地暖和水地暖应该注意什么(What should be paid attention to when installing electric floor heating and water heating)
What should be paid attention to when installing electric floor heating and water heating?
First, the temperature controller position.
The thermostat should be selected in the air temperature uniform, should not be in place in front of the window, wall, etc. the air temperature change greatly. Temperature controller from the ground height of 1.2 -1.5 meters, should not be placed below the cabinet, bonsai and other temperature control probe temperature measuring items.
Two, wiring layout.
Every road leads to the thermostat wire by FireWire, zero line, ground wire, and from the air distribution box alone came to the thermostat. No other electrical appliance should be connected in parallel with the line. Wires shall be made of copper wire of 2.5 square feet in diameter.
Three, slotted walls.
In the layout of electrical wires, the thermostat position need to embed the cassette 86. Temperature control to the ground, this section should open a good groove, the width of the slot depends on the specific circumstances, do not bury the pipe, leaving the ground heating staff.
Four, ground leveling.
In the construction of water electrical engineering, water pipes and pipe lines should be slotted or all along the wall, but not in the center. After the end of the water and electricity, the ground should be cleaned before laying the ground warm. If the ground is uneven, leveling should be done first.
Five, toilet waterproof.
Before laying the ground, the ground should be made of waterproof layer, and the wall height of waterproof layer should be 1.8 meters.
Six, power capacity increase.
At present the general household capacity: 120 square meters in the house below 8 kilowatts; 120-150 square meters to 150 square meters more than 12 kilowatts, 16 kilowatts. You can determine whether you need to increase capacity according to the total power of your home appliance. According t
您可能关注的文档
- 声乐练习(Vocal exercises).doc
- 声波原理与窃听技术(Principles of sound waves and eavesdropping techniques).doc
- 复习参考题(Review reference questions).doc
- 复习经验(Review experience).doc
- 复印机常见故障(Copier common faults).doc
- 复试如何直面导师(How to tutor face to face).doc
- 复垦流程(Reclamation process).doc
- 复旦大学水平测试试题(Fudan University proficiency test).doc
- 复试行程指南(Re examination tour guide).doc
- 复印机的保养使用常识(Maintenance and use of copiers).doc
- 2025年重庆海联职业技术学院单招职业技能测试题库及完整答案1套.docx
- 2025年云南能源职业技术学院单招职业技能测试题库(精选题).docx
- 交叉学科创新突破.pptx
- 教学成果与进步分析.pptx
- 2025年洛阳科技职业学院单招职业技能测试题库(实用).docx
- 2025年江西工商职业技术学院单招职业技能测试题库附答案(培优b卷).docx
- 2025年陕西国防工业职业技术学院单招职业技能测试题库及答案(易错题).docx
- 2022年上海海洋大学自考英语(二)练习题(附答案解析).pdf
- 2025年深圳信息职业技术学院单招职业技能测试题库附答案(名师推荐).docx
- 2023年北京市大兴区中考数学二模试卷(附答案详解).pdf
文档评论(0)