建设工程概算(下)(Budget estimate for construction projects (below))
建设工程概算(下)(Budget estimate for construction projects (below))
Examination requirements
According to the syllabus requirements, candidates in this part need to understand and are familiar with and master main content is: the theory of construction project budget, construction budget, construction project settlement and the completion of the basic meaning, classification, function etc..
This part of the examination aims to test the basic understanding and mastery of the relevant concepts of construction projects.
Main test site
I. budgetary estimate of construction projects
Two. Construction budget
Three, construction project settlement and final accounts
The forty-eighth chapter estimates the construction project
Section 1 meaning and composition of construction cost
I. implications of the budgetary estimate for construction projects
Construction project budget refers to the design units in the preliminary design stage, according to the design drawings and specifications, the budget quota (or budget index), the cost of quota data, or by reference to similar engineering budget documents, calculate and determine the construction cost of the entire construction documents with scientific methods.
Two, construction project budget book content
1. cover
2. summary of cost estimate for construction projects
3. construction project budget preparation Notes
4. construction budget
Three, construction project budget preparation principles and basis
1. principles of organization
2. compilation basis
Four, the preparation method of construction budget estimate
Building engineering generally includes buildings and structures in two major categories. Three methods can be adopted: budget estimate, budget estimate, budget estimate, and budget estimate for similar projects.
The second part estimate and budget quota method for construction project
I. Basic Conditions for making budgetary estimates with budgetary estimates
Two, compiling steps and methods
1. collect the basic data of the
您可能关注的文档
- 安保部量化(Security department quantification).doc
- 安全员个人工作总结(Personal work summary of security officer).doc
- 安全员先进事迹材料(Advanced materials for security personnel).doc
- 安保管理制度(Security management system).doc
- 安全消防管理制度(Safety fire management system).doc
- 安全增长率(Safe growth rate).doc
- 安全生产七种兵器(Safe production of seven weapons).doc
- 安全管理二十条红线(Twenty red lines of safety management).doc
- 安全生产演讲稿-加强班组建设,增强凝聚力,提高班组安全水平(Safety production speech - strengthen team building, strengthen cohesion, and improve team safety level).doc
- 安全第一(Safety first).doc
文档评论(0)