网站大量收购闲置独家精品文档,联系QQ:2885784924

文明施工措施(Civilized construction measures).doc

文明施工措施(Civilized construction measures).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
文明施工措施(Civilized construction measures)

文明施工措施(Civilized construction measures) Civilized construction measures, 2009-03-03, 14:401., civilized construction measures 1.1 health management 1) the work site is always kept clean and sanitary. The roads are level, solid, clear and equipped with drainage facilities. Transport vehicles come out without sediment, and do not leave without spreading. 2) the living area should be kept clean and orderly inside and outside, with no pollution and no sewage, and the rubbish will be piled up in time and cleaned up in time. 3) there are special people in charge of the hygiene work in the canteen, and strictly enforce the food hygiene law and other related systems. 4) drinking water to ensure the supply of hot water, drinking water appliances hygiene. 5) on-site toilets (including floor toilets) have special cleaning. 1.2 pollution control 1.2.1 air pollution 1) the erection of temporary construction waste garbage or using special closed container lifting, it is strictly prohibited to air scatter, the timely removal of garbage, the amount of water, reduce dust. 2) cement and other fine powder bulk materials, to take indoor (or closed) storage or close cover, unloading, take effective measures to reduce dust. 3) the temporary road surface shall be hardened to prevent road dust. 4) when setting up mixing equipment, dust prevention device shall be installed 1.2.2 water pollution 1) carry on the concrete, the mortar and so on the mixing operation scene, sets the sedimentation pond, causes the cleaning machinery and the transportation vehicles waste water to precipitate through the municipal sewage pipeline or the recycling, uses in sprinkling the dust. 2) control the flow of sewage generated by the construction, prevent the overflow, and set up the settling tank in a reasonable place. After precipitation, it will be discharged into the sewage pipeline. The construction area is not allowed to flow and pollute the environment. 3) storage of oil in the warehouse, anti leakage tr

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档