网站大量收购独家精品文档,联系QQ:2885784924

日哦(Oh).doc

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
日哦(Oh)

日哦(Oh) I. practice objective: 1.. Contact the level setting, leveling, aiming and reading, and how to measure Gao Cheng between two points on the ground; 2. master theodolite in alignment, Engineering surveying practice report The text of practice report on Engineering Surveying begins - - I. practice objectives: 1. contact level setting, leveling, aiming and reading, and how to measure elevation between two points on the ground; 2. master the theodolite, centering, leveling, aiming, reading and other basic operation essentials; 3. to master the general method of steel tape distance; 4. practice with theodolite with small flat-panel mapping topographic map; 5., train students to use comprehensive measurement theory knowledge to analyze and solve the general problems in civil engineering lofting. Two. Internship requirements: 1. master level, theodolite, flat instrument and some other main performance and how to operate; 2. master data calculation and processing methods; This article from: grow up navigation model essay net [/fanwen/] with the source reference: /fanwen/html/3889.html3. master the basic methods of topographic mapping, surveying and mapping area of large scale topographic map work ability; 4. master the basic method of survey setting. Three. Internship tasks; 1. elevation survey of control points; 2. wire length measurement; 3. horizontal angle measurement; 4. calculation of closed traverse; 5. surveying and mapping topographic map; 6. building lofting, road centerline measurements and pipeline measurements. Four. Internship programs and procedures: 1. industry survey: (1) measure the elevation of control points; (2) measure the distance between control points; (3) measurement of closed traverse. 2. internal calculation: (1) calculate the elevation difference between the control points, and calculate the elevation between the points; (2) calculate the distance between the control points and the relative error; (3) calculate the angles and angle closure

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档