网站大量收购独家精品文档,联系QQ:2885784924

日本新干线(shinkansen).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
日本新干线(shinkansen)

日本新干线(shinkansen) Shinkansen japan: [origin of Shinkansen] After the two World War, the second half of 50s, Japans rapid economic recovery, significantly speeding up the pace of development, and the business and circulation of the Keihin, Chukyo, especially in the developed area has become the Hanshin locomotive drive the entire Japanese economy. Connecting these areas Tokaido railway line in Japan accounted for 3% of the total length of railway, but take 24% of the total national passenger traffic and freight transport volume 23%, and the annual growth rate higher than the national average, transport capacity has reached the limit. At that time, the Japanese economy has begun the transition from the Renaissance to high growth, to promote economic development, achieve rich target, strengthen the connection of the three industrial zone and the surrounding areas Tokaido railway has become an urgent need. To this end, the Ministry of transport was set up in 1957 by the experts of the Japanese state railway survey , discusses how to enhance the transport capacity of the Tokaido railway line problem. In December 1958, the Japanese cabinet approved a plan to build the Tokaido shinkansen. Japanese National Railway Survey was put forward three options: one is to have the original narrow gauge railway line line of double track again; two is laying a new line of narrow gauge; three is the new line construction of the standard gauge. After careful study, to maximize the Tokaido railway line speed up, became the standard rail behoove chose to build the new route. Specifically, there are a number of reasons: one, compared with the original narrow gauge, standard gauge can run large vehicles, ensure transport capacity can be expanded; two, the laying of the new route, through widening the curve radius to set the high-speed train, thus to shorten the maximum time to reach three, the standard of construction; the new rail route can be greatly reduced by the urban part of the city,

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档