- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
日本新干线(shinkansen)
日本新干线(shinkansen)
Shinkansen japan:
[origin of Shinkansen]
After the two World War, the second half of 50s, Japans rapid economic recovery, significantly speeding up the pace of development, and the business and circulation of the Keihin, Chukyo, especially in the developed area has become the Hanshin locomotive drive the entire Japanese economy. Connecting these areas Tokaido railway line in Japan accounted for 3% of the total length of railway, but take 24% of the total national passenger traffic and freight transport volume 23%, and the annual growth rate higher than the national average, transport capacity has reached the limit. At that time, the Japanese economy has begun the transition from the Renaissance to high growth, to promote economic development, achieve rich target, strengthen the connection of the three industrial zone and the surrounding areas Tokaido railway has become an urgent need. To this end, the Ministry of transport was set up in 1957 by the experts of the Japanese state railway survey , discusses how to enhance the transport capacity of the Tokaido railway line problem. In December 1958, the Japanese cabinet approved a plan to build the Tokaido shinkansen.
Japanese National Railway Survey was put forward three options: one is to have the original narrow gauge railway line line of double track again; two is laying a new line of narrow gauge; three is the new line construction of the standard gauge. After careful study, to maximize the Tokaido railway line speed up, became the standard rail behoove chose to build the new route. Specifically, there are a number of reasons: one, compared with the original narrow gauge, standard gauge can run large vehicles, ensure transport capacity can be expanded; two, the laying of the new route, through widening the curve radius to set the high-speed train, thus to shorten the maximum time to reach three, the standard of construction; the new rail route can be greatly reduced by the urban part of the city,
您可能关注的文档
- 建设北黄海地区现代化生态型中心城市(Construction of modern ecotype central city in north the Yellow Sea).doc
- 建筑设计规范大全目录(Architectural design specifications Daquan directory).doc
- 建设工程概算(下)(Budget estimate for construction projects (below)).doc
- 建设项目修建性详细规划(总平面规划)管理规定(Provisions on the construction of detailed detailed planning (general plan planning) for construction projects).doc
- 建设项目造价管理的重点也要转向设计阶段(Construction project cost management should also focus on the design phase).doc
- 建筑节能环境下的外墙节能施工(Energy saving construction of exterior wall under building energy saving environment).doc
- 开业剪彩仪式方案流程(Opening ribbon cutting ceremony, program flow).doc
- 开场用语(Opening remarks).doc
- 开婚庆公司流程(Wedding company process).doc
- 开家宠物店如何赚钱管理(How do you manage to open a pet store).doc
文档评论(0)