- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅谈施工阶段的造价控制与管理(Construction cost control and management at construction stage)
浅谈施工阶段的造价控制与管理(Construction cost control and management at construction stage)
Construction cost control and management at construction stage
Abstract: the construction phase of the project cost control is the whole process of project cost control is a very important link, only participants have a clear understanding on the thought, and in the project implementation process by taking some effective methods to control the construction phase of the project cost can be effectively controlled, obtain good investment effect.
Key words: construction stage; cost control; measures
Construction cost refers to the construction of a project expected expenditure or actual expenditure of all fixed assets investment costs, ie engineering investment costs or engineering prices. The basic task of the project cost control project cost management is reasonable and effective, reasonable and effective control of project cost, should be throughout the project decision-making, project design, project bidding, project construction, project completion stages. The different engineering construction stage of cost control, the emphases and methods are different, the construction stage of the construction project is based on the design drawings, process of raw materials, semi-finished products, equipment into engineering entity, is the main stage of the construction project value and use value of the project cost management, this stage is specific and complex, from the audit settlement of my many years of engineering point of view, put forward his own opinion on the causes of project construction phase cost control and method should be adopted.
I. The reason why the construction cost is out of control at the construction stage
(1) the terms of the contract are not perfect enough
Construction contract, that is, construction and installation project contract, is the contract between the developer and the contractor to complete the agreed construction and installation project, and clearly define
您可能关注的文档
- 文正(Donald).doc
- 新余国际广场(Xinyu International Plaza).doc
- 新停车场(New parking lot).doc
- 新免费停车(New free parking).doc
- 新会计准则第21号——租赁(New Accounting Standard No. twenty-first - lease).doc
- 新公司简介(New company profile).doc
- 新加坡商业区(Singapore Business District).doc
- 新加坡广告自律与新加企业培训坡广告标准局(asas)(Singapore advertising self-regulation and new enterprise training slope Advertising Standards Agency (ASAS)).doc
- 新动力英文外链url收割机使用教程(New power English chain URL harvester tutorial).doc
- 新加坡(Singapore).doc
- 多囊卵巢综合症的基础知识:理解疾病的病因、病理与机制.pptx
- 白血病患者的睾丸白血病预防与治疗.pptx
- 不孕不育患者的定期检查及随诊安排:及时发现并处理问题,调整治疗方案.pptx
- 不孕不育患者的药物治疗依从性提高方法:合理用药,定期随访与调整治疗方案.pptx
- 国货美妆在行动:谷雨、半亩花田等企业捐款捐物支援西藏地震灾区.docx
- 5.14.2.1千姿百态的动物世界(第二课时) 教案 生物苏教版八年级上册.pdf
- 5.14.2.1千姿百态的动物世界(第一课时) 教案 生物苏教版八年级上册.pdf
- 5.14.1.2五彩缤纷的植物世界(第二课时) 教案 生物苏教版八年级上册.pdf
- 5.14.1.1五彩缤纷的植物世界(第一课时) 教案 生物苏教版八年级上册.pdf
- 5.14.2.4千姿百态的动物世界(第四课时) 教案 生物苏教版八年级上册.pdf
最近下载
- 《宪法学》课后习题及答案.pdf VIP
- 陕西省水利建筑工程概算定额(上、下册)_陕西省水利厅_2018_1_1.pdf
- 组织行为学(高职高专) 教学课件 作者 周卫群 10).ppt
- 《电子商务基础与实务》考核试题及答案(共100题).docx
- 2024新信息科技四年级《第五单元数据表达我做主》大单元整体教学设计[2022课标].pdf
- (高清版)DB43∕T 2724-2023 农村公路养护工程预算编制办法及定额.pdf VIP
- 东进-FPD材料介绍.pdf
- (word精品)2022年河南省郑州市中考一模物理试题(考试专用).docx
- 沙门氏菌学习课件.pptx
- 焊接工艺评定课件.pptx VIP
文档评论(0)