- 1、本文档共8页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
浅谈砌体结构的质量问题(Discussion on quality of masonry structure)
浅谈砌体结构的质量问题(Discussion on quality of masonry structure)
Masonry structure is made of block and mortar, and the wall and column are the main structure of the building. As everyone knows, the masonry structure building in accordance with local conditions, local materials principle. Compared with the reinforced concrete structure, the cement and the reinforcing steel can be saved, and the cost is reduced. Therefore, masonry structure has played an irreplaceable role in the development and construction of new China in the past decades.
While the masonry structure is widely used, many quality accidents have also been found. There are four kinds of common quality problems in masonry engineering:
First, masonry strength is insufficient
1 、 the design cross section is too small and the bearing capacity is not enough;
2, water, electricity, warm, Wei device, leaving holes, leaving the slot, weakened wall section too much;
3, the quality of material failure, such as masonry bricks and mortar strength level does not meet the design requirements, the use of substandard cement and admixture;
4, poor construction quality, serious shortage of mortar fullness, construction of brick is not flooded, causing insufficient strength of gray joint.
Two, masonry dislocation, deformation
1, masonry wall thickness ratio is too large, resulting in the use of stage instability deformation;
2, construction quality problems, such as vertical deflection of the wall, after the use of force and increase deformation, or even staggered;
3, the construction sequence is improper, such as vertical and horizontal wall and bite Cha masonry, resulting in new masonry wall out of plane deformation instability;
4, improper construction process such as sand lime brick masonry, masonry lead to instability.
Three, partial damage or collapse
1, due to the impact of wall construction or in the use of off angle, piercing and even partial collapse;
2, the wall was corroded by caustic soda in the process of use, whic
您可能关注的文档
- 文正(Donald).doc
- 新余国际广场(Xinyu International Plaza).doc
- 新停车场(New parking lot).doc
- 新免费停车(New free parking).doc
- 新会计准则第21号——租赁(New Accounting Standard No. twenty-first - lease).doc
- 新公司简介(New company profile).doc
- 新加坡商业区(Singapore Business District).doc
- 新加坡广告自律与新加企业培训坡广告标准局(asas)(Singapore advertising self-regulation and new enterprise training slope Advertising Standards Agency (ASAS)).doc
- 新动力英文外链url收割机使用教程(New power English chain URL harvester tutorial).doc
- 新加坡(Singapore).doc
文档评论(0)