- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
测试管理体系(Test management system)
测试管理体系(Test management system)
Volume number
Volume ID
Dense
Test management system
Project name:
Project number:
Writers:
Writing date:
Examination and approval personnel:
Approval date:
History revision record
version number
Modify person / date
abstract
Authorized person / date
V1.1
Wei Wei, /2004-8-22
Preliminary formulation
Catalog
1. introduction 3
1.1 goal 3
1.2 background 3
2. software testing management system 3
2.1 test plan 3
2.2 test design 4
2.3 test implementation 4
2.4 configuration management 4
2.5 test management 5
2.6 test tool management 5
2.7 test risk prediction and control 5
3. test personnel management 5
3.1 related test roles and responsibilities: 5
3.2 personnel allocation during the test management system 6
Software test management system
1. introduction
1.1 goals
In order to provide specifications, requirements, personnel management and test process control in the testing process, a software testing management system has been developed
1.2 background
In order to improve the whole system of software factory, it is urgent to build a set of test flow
2. software test management system
2.1 test plan
To determine the objectives and strategies for each test phase. This process will output the test plan, clear to the completion of the test, the time required to complete assessment of activities and resources, design test organization and job functions, activities and arrangements for the allocation of resources, schedule tracking and control testing process.
The process must be completed:
1. define test phase goals and Strategies
2. determine the test phase input and output
3. define the test activities to be completed
4. evaluate the time and resources needed to complete the event
5. define the functions of the test organization and post
6. arrange activities and allocate resources
7. arrange, follow and control the activities of the testing process
2.2 test design
According to the test plan, test design. The test design process output is the te
您可能关注的文档
- 新加坡广告自律与新加企业培训坡广告标准局(asas)(Singapore advertising self-regulation and new enterprise training slope Advertising Standards Agency (ASAS)).doc
- 新动力英文外链url收割机使用教程(New power English chain URL harvester tutorial).doc
- 新加坡(Singapore).doc
- 新型simncr系高强度粗钢筋材料的研制(Development of a new type of high strength coarse steel bar reinforced with simncr).doc
- 新型智能化焊在钢壁管道上的效用(The utility of a new type of intelligent welding on steel wall pipelines).doc
- 新型装饰材料论文对新材料的展望论文(New decorative materials, papers on the prospects of new materials).doc
- 新人教版七年级地理下册复习资料完整版_百_20150617_061525(New edition seven grade geography review _ 100 full version 2 _20150617_061525).doc
- 新城说辞(Metro rhetoric).doc
- 新宝来手自一体使用方法(New Bora hand in use method).doc
- 新宝来手自一体使用指南(New Bora hand in hand guide).doc
文档评论(0)