- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
测量队工作简介(Survey team work brief)
测量队工作简介(Survey team work brief)
Survey team work brief
A measurement is a technique for measuring the relative positions of points on a ground point so as to display natural and artificial objects in proportion according to the correct horizontal or vertical relation between them. Measurement is the eye of engineering construction, relating to every link and process of engineering construction, and plays an important role in engineering construction.
At the beginning of the project, the surveyor shall contact the site supervision engineer first, carry out the on-site handover of the known construction control network, and obtain the records of the known construction control network and the points. Because of the interference or damage of the earlier construction and the change of the surrounding environment, the control point is likely to drift or subside, so it is necessary to know the repetition of the control network. Then, according to the accuracy of the known construction control network and the accuracy of the equipment equipped with the project, the retest scheme of the construction control network is determined. Generally, the same method is used to retest the known control network. The retest is divided into plane control survey and elevation control survey. Horizontal control survey adopts GPS survey or total station method to measure back. Height control survey adopts leveling method or photoelectric distance trigonometric leveling instead of leveling method. Retest should be carried out in strict accordance with the norms, engineering measurement, water conservancy and Hydropower Engineering Specification for hydropower and water conservancy project measurement norms, norms, GPS measurement or other measurement standards, the occurrence of non-standard gauge or record must be re measured or buce. After the completion of the retest, the external industry will undergo 200% independent inspections, and the accuracy of the error can be adjusted without exce
您可能关注的文档
- 新宝来操作(New Bora operation).doc
- 新居落成对联(New homes completed couplets).doc
- 新希望管理就要以人为本(New hope management should be people-oriented).doc
- 新好哥哥(New good brother).doc
- 新手新车注意事项(Novice new car notes).doc
- 新手操作电脑的常见误区(Common mistakes of novice operating computer).doc
- 新循环经济学——中国的经济学(New cycle economics Chinese economics).doc
- 新手老手必看上坡起步方法(Novice veteran must see the uphill starting method).doc
- 新时期加大利度推动街道残联相关工作(In the new period, we should increase the interest and promote the relevant work of the street CDPF).doc
- 新时达32位主板故障代码说明(Step 32 motherboard fault code).doc
- 分布式控制系统(DCS)系列:Schneider Electric EcoStruxure Foxboro DCS (煤炭工业应用)_6.操作员界面与HMI设计.docx
- 分布式控制系统(DCS)系列:Honeywell Experion PKS (煤炭工业应用)_5.人机界面HMI的设计与优化.docx
- 温度控制系统系列:Omron NX1P 温度控制模块_(8).温度控制系统的故障诊断与排除.docx
- 温度控制系统系列:Omron NX1P 温度控制模块_(10).NX1P与其他设备的通讯与集成.docx
- 温度控制系统系列:Mitsubishi MELSEC-Q 温度控制模块_(4).温度控制模块硬件结构与接口.docx
- 现场总线控制系统(FCS)系列:Beckhoff EtherCAT (煤炭工业应用)_5. EtherCAT系统架构与工作原理.docx
- 分布式控制系统(DCS)系列:Emerson DeltaV (煤炭工业应用)_(3).DeltaV系统的硬件组成.docx
- 温度控制系统系列:Omron NX1P 温度控制模块_(4).NX1P的工作原理与控制算法.docx
- 温度控制系统系列:Omron CJ2M 温度控制模块_(12).温度控制系统的安全与法规要求.docx
- 温度控制系统系列:Mitsubishi MELSEC-Q 温度控制模块_(9).温度控制应用案例分析.docx
文档评论(0)