浙江三门核电站(Zhejiang three nuclear power station)
浙江三门核电站(Zhejiang three nuclear power station)
Three nuclear power plants
In July 2004, the first phase of the construction of the three nuclear power plants in southern Zhejiang was approved by the state council. It was the second nuclear power plant to be built in Zhejiang province after Chinas first self designed and built nuclear power plant, Qinshan nuclear power station. The total installed area of three nuclear power stations is 7 million 400 thousand cubic meters, and 6 sets of 1 million KW nuclear power units (AP1000) can be installed respectively. Fully built, the total installed capacity will reach 12 million kilowatts or more, exceeding the total installed capacity of the Three Gorges power station. A total investment of 25 billion yuan, will be the first to build two currently the most advanced 1 million KW pressurized water reactor technology unit. The three nuclear power plant will soon play a role around 2014.
Catalog
1 Introduction
2 position
3 owners
4 construction projects
5 History
6 technological advantages
6.1 summary
6.2, the worlds most advanced nuclear power unit
6.3 powerful clean energy
6.4, a new record of Chinas nuclear power
7 relevant information
7.1 technical level
1 Introduction
In July 2004, the first phase of the construction of the three nuclear power plants in southern Zhejiang was approved by the state council. Three gate nucleus
Location map of three nuclear power stations
The power station covers an area of 7 million 400 thousand square meters, and can install 6 sets of 1 million 250 thousand KW nuclear power plants respectively. Fully built, the total installed capacity will reach more than 7 million 500 thousand kilowatts, the first phase of a total investment of 25 billion yuan, will be the first to build two of the current domestic advanced 1 million kilowatt pressurized water reactor technology unit. The three nuclear power plant will soon play a role around 2014.
The three nuclear power project is the first national nucle
您可能关注的文档
- 新时期加大利度推动街道残联相关工作(In the new period, we should increase the interest and promote the relevant work of the street CDPF).doc
- 新时达32位主板故障代码说明(Step 32 motherboard fault code).doc
- 新楼盘销售流程(New real estate sales process).doc
- 新江南民居(New Jiangnan dwellings).doc
- 新法断语小注(The new note.).doc
- 新视野大学英语 第二版 2 unit 3 section a跨国婚姻(New horizons, College English, Second Edition, 2, unit 3, section, a, transnational marriage).doc
- 新能源汽车,正在崛起的新兴产业龙头(New energy vehicles, the emerging emerging industry leader).doc
- 新视野大学英语第二版第二册第二单元(New horizons, College English, Second Edition, second book, second unit).doc
- 新视野大学英语第五单元单词(New Horizon College English fifth unit words).doc
- 新货币经济学的理论构想及可行性(Theoretical conception and feasibility of new monetary economics).doc
- 吉林省白城一中2020_2021学年高一地理上学期第二次阶段考试试题PDF.pdf
- 2025年河南中医药大学单招职业适应性测试题库及答案1套.docx
- 2025年朝阳师范高等专科学校单招职业倾向性考试题库附答案.docx
- 2025年茶山茶园使用权租赁服务合同规范模板.docx
- 2025年新疆克拉玛依市单招职业倾向性考试题库审定版.docx
- 二零二五年度轻钢结构厂房施工与安全监管合同手册.docx
- 二零二五版物流运输劳动合同封面.docx
- 二零二五年度标书廉政承诺书——招标投标活动廉洁自律规范.docx
- 2025版NDA必威体育官网网址协议,共筑行业安全防线.docx
- 2025版餐饮连锁品牌加盟代理承包协议书.docx
文档评论(0)