网站大量收购闲置独家精品文档,联系QQ:2885784924

电力负荷预算(Power load budget).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电力负荷预算(Power load budget)

电力负荷预算(Power load budget) Power load budget.Txt iron rice bowls true meaning is not to eat a lifetime in a place, but a lifetime to eat everywhere. It is a piece of shit, also have met shikelang day. So you dont have to worry too much about yourself today. The second chapter is power load budget sixth section maximum load power forecast method Maximum load power, or peak load, can be broadly divided into the following three categories: Direct prediction method; electric load rate method; load curve method. Some of the forecasting methods discussed above can predict the maximum load of the power system directly according to the load data of the system. However, in general, the maximum load of the power system is usually calculated before the electricity consumption is forecasted, that is to say, the so-called electricity load rate method is adopted. This is because the electricity consumption data, whether it is power grid or user, is relatively stable in the year after year change. Its data is easy to statistics and complete, and the change rule is obvious, and it is easy to construct or establish prediction model. But the distribution of peak load is in power on the time coordinate, randomicity, so if the various forecasting methods discussed above to directly predict the peak load larger error will be produced, so, in the long term peak load forecasting power load rate method are selected. Lets introduce some conventional methods for predicting the maximum load power. According to the different prediction angles, the maximum load forecasting can be divided into the comprehensive maximum load forecasting of the power system (user side) and the maximum load forecasting of the power generation system (power supply side). Among them, the power system integrated maximum load method, mainly in the following. 1. typical curve superposition method The typical curve load superposition method is to use the typical daily load curve of all kinds of users to carry out the supe

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档