砂石系统调试及试运行作业指导书(Instruction for commissioning and operation of sand and gravel system)
砂石系统调试及试运行作业指导书(Instruction for commissioning and operation of sand and gravel system)
Instruction for commissioning and operation of sand and gravel system
This article is contributed by yhz963
Quality system documentation
Instruction for commissioning and operation of sand and gravel system
Document number: Number: the number: control requirements:
Compile: check:
To examine:
Approval:
Date of issue: date of release:
1 check the equipment before commissioning and 1.1. Check whether the components of the equipment are properly assembled, and whether all the connecting bolts are pressed as required
Is the welding site firm and reliable?. 1.2 check all lubrication areas of the equipment, the amount of lubricating oil and brand must comply with equipment technology
Documentation requirements. 1.3 inspect the drive or drive belt, the installation of couplings or pulleys, and the tension of the belt
Shall comply with the requirements of the equipment installation instructions. 1.4 hydraulic lubrication system equipment, must check the hydraulic lubrication system all the pipeline connection, the connection of the pipeline should be correct, oil level and oil pressure should meet the requirements, hydraulic system without oil leakage. 1.5 check the insulation of the motor and electrical equipment, motor insulation should meet the requirements, the cabinet wiring
It should be correct. 1.6 remove sundries around the equipment and keep the site clean and tidy. No foreign objects are allowed in the equipment.
2 single machine debugging 2.1 electrical and operation control system adjustment test
2.1.1 check according to electrical principle diagram and installation wiring diagram, internal wiring and external wiring must be correct. 2.1.2 according to the type of power supply, classification and capacity to check, debug its cut-off capacity, fuse capacity, overvoltage, undervoltage, over-current protection, etc., inspection or debugging content must comply with its specified
您可能关注的文档
- 液压缸演示文稿(Hydraulic cylinder presentation).doc
- 深圳免费玩的地方(Free places to play in Shenzhen).doc
- 液压顶管机(Hydraulic pipe jacking machine).doc
- 深圳城市更新改造中经济和社会问题的思辩(Shenzhen City Economic and social problems in the transformation of thinking).doc
- 液压缸气蚀原因及预防措施(Causes of hydraulic cylinder cavitation and preventive measures).doc
- 液压计算(Hydraulic calculation).doc
- 深圳翠竹文化广场简介(Brief introduction of Shenzhen Jade Cultural Square).doc
- 深圳松下洗衣机维修(Shenzhen Panasonic washing machine maintenance).doc
- 深圳金章洗衣机维修(Shenzhen Jin Zhang washing machine maintenance).doc
- 深度分销的核心动力——建设客户顾问队伍(Core power of deep distribution building customer consultant team).doc
文档评论(0)