资料员考试(Reference examination)
资料员考试(Reference examination)
2007 second construction project clerk examination questions
(time: 100 minutes, closed volume)
Fill in the blanks (40 points, 1 cents per space)
1. The minimum warranty period for housing construction is:
1) engineering and engineering limits for the rational use of the works as specified in the design documents.
2) roofing waterproofing works, waterproof requirements of bathrooms, rooms and walls of the seepage prevention, for the year.
3) heating and cooling systems are 1 heating and cooling periods.
4) the installation of electric pipelines, water supply and drainage pipelines and equipment is 2 years.
5) renovation project for 2 years.
6) the project is 3 years.
2, project files pre acceptance by the construction unit collects all information of the units, supervision units and construction units are complete, apply to the urban construction archives management departments, urban construction archives management department received the application for pre approval within 7 working days. Acceptance certificate shall be issued within 3 working days after acceptance.
3, engineering documents in text, material size, size, specifications should be A4, drawings should use national standard map.
4. The basic contents of the completed stamp should include: the completed plan, the construction units, the establishment, the auditor, the technical person, the date of preparation, the supervision unit, the site supervisor and the director. As built drawing size is:.
5, where the construction plan, structure, process, layout and other significant changes, or change more than the part of the map surface, should be re drawing. Engineering drawings of different width should be folded in width, folded horizontally and vertically clockwise.
6, the project file is not less than 4 sets, a set by safekeeping, a set of (original) transfer.
7, engineering documents are divided into Supervision documents, completed drawings, final acceptance documents, and
您可能关注的文档
- 百g园林素材(Hundred g garden material).doc
- 百富勒案例分析(Case study of 100 Fuller).doc
- 百年的人民大街——贯穿长春市区的中轴线文库(One hundred years of people's street -- the central axis library through Changchun City).doc
- 百度中的带钢简介(Introduction of strip steel in Baidu).doc
- 百度中的有哪些信誉好的足球投注网站技巧(Search skills in Baidu).doc
- 百度有哪些信誉好的足球投注网站_液压技术(Baidu search _ hydraulic technology).doc
- 盆栽苹果(Potted apple).doc
- 监控设备的选择(Selection of monitoring equipment).doc
- 皮纹检测、优势学习管道与八大智能的培养_回归自然的空间空间(Space dermatoglyphics, culture _ pipeline and the advantages of learning eight intelligence to return to nature).doc
- 盐城城区规划(Yancheng urban planning).doc
文档评论(0)