- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
资料3(Information 3)
资料3(Information 3)
Five. Lead time
Figure 5 details the lead time involved, which is started by processing the lead time of material processing, to finished products so far. Before production
Set aside time from raw material purchase to finished product storage. The customer lead time starts with the customer order until the customer receives the finished product
.
Customer orders issued up
With the input of receiving orders
Processing of orders
The production plan, draft
The procurement of raw materials, increase
The operation time,,
We carry out the material receiving
Inspection, storage, handling,
Work orders issued, Gu,
The supply of customers, increase
1 / set, transported to the workstation of students
Wait for the purchase, production, processing,
The processing of before, before,
Wait, set, set, and handling
And in handling, chrysene, semi-finished products, when stacked, when the work of
Of moving to the next workstation, between, between the front of
Wait, we carry out the processing of
When we carry out processing,,
Wait, handling, we carry out.
Whether or not, to complete the processing work, we carry out
- is,,,
Here, we carry out
Handling of finished products into the case:
The storage of
Out of finished products
Packing, shipment
The transport of
Customers receive products:
Figure 5 definition of lead time detail
Cutting customer lead times is an important tool for achieving high output manufacturing management, but how should we reduce lead time? Machinery processing industry
The research shows that the time spent in machining only accounts for 5% of all lead time, while machining lead time only accounts for pre production lead time
Between 30%, therefore, processing time accounts for only 1.5% of the lead time. A manufacturing firm has made a thorough investigation of its lead time
Only 121 minutes were spent on processing and assembly operations when the lead time of the 22 perimeter customer order was found. Thus triggering widespread management
T
您可能关注的文档
- 百年的人民大街——贯穿长春市区的中轴线文库(One hundred years of people's street -- the central axis library through Changchun City).doc
- 百度中的带钢简介(Introduction of strip steel in Baidu).doc
- 百度中的有哪些信誉好的足球投注网站技巧(Search skills in Baidu).doc
- 百度有哪些信誉好的足球投注网站_液压技术(Baidu search _ hydraulic technology).doc
- 盆栽苹果(Potted apple).doc
- 监控设备的选择(Selection of monitoring equipment).doc
- 皮纹检测、优势学习管道与八大智能的培养_回归自然的空间空间(Space dermatoglyphics, culture _ pipeline and the advantages of learning eight intelligence to return to nature).doc
- 盐城城区规划(Yancheng urban planning).doc
- 盖楼程序(Levy program).doc
- 盘点2013年微信公众号营销经典案例(Inventory 2013 WeChat public marketing classic case).doc
文档评论(0)