网站大量收购独家精品文档,联系QQ:2885784924

资料3(Information 3).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
资料3(Information 3)

资料3(Information 3) Five. Lead time Figure 5 details the lead time involved, which is started by processing the lead time of material processing, to finished products so far. Before production Set aside time from raw material purchase to finished product storage. The customer lead time starts with the customer order until the customer receives the finished product . Customer orders issued up With the input of receiving orders Processing of orders The production plan, draft The procurement of raw materials, increase The operation time,, We carry out the material receiving Inspection, storage, handling, Work orders issued, Gu, The supply of customers, increase 1 / set, transported to the workstation of students Wait for the purchase, production, processing, The processing of before, before, Wait, set, set, and handling And in handling, chrysene, semi-finished products, when stacked, when the work of Of moving to the next workstation, between, between the front of Wait, we carry out the processing of When we carry out processing,, Wait, handling, we carry out. Whether or not, to complete the processing work, we carry out - is,,, Here, we carry out Handling of finished products into the case: The storage of Out of finished products Packing, shipment The transport of Customers receive products: Figure 5 definition of lead time detail Cutting customer lead times is an important tool for achieving high output manufacturing management, but how should we reduce lead time? Machinery processing industry The research shows that the time spent in machining only accounts for 5% of all lead time, while machining lead time only accounts for pre production lead time Between 30%, therefore, processing time accounts for only 1.5% of the lead time. A manufacturing firm has made a thorough investigation of its lead time Only 121 minutes were spent on processing and assembly operations when the lead time of the 22 perimeter customer order was found. Thus triggering widespread management T

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档