历年环评工程师案例分析真题考点剖析(05-07年)(Over the years the EIA Engineer case analysis test Zhenti analysis (05-07)).doc

历年环评工程师案例分析真题考点剖析(05-07年)(Over the years the EIA Engineer case analysis test Zhenti analysis (05-07)).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
历年环评工程师案例分析真题考点剖析(05-07年)(Over the years the EIA Engineer case analysis test Zhenti analysis (05-07))

历年环评工程师案例分析真题考点剖析(05-07年)(Over the years the EIA Engineer case analysis test Zhenti analysis (05-07)) China Environmental Impact Assessment net collection China Environmental Impact Assessment net collection make One Over the years the EIA Engineer exam test center analysis case analysis An analysis of the key points of a.05 case 05 years of case analysis papers 8 questions, before The 2 is to do the problem, all industrial cases (involving building materials, machinery items) Second of these are industrial acceptance cases. Back 6 cases need to be chosen 4, including industrial cases 4 questions (involving) And social services, real estate, chemicals, light industry, hazardous waste disposal), ecological cases 2 questions (involving highways, gas pipelines). The first question (must be done) is about a cement plant expansion project. The test sites involved include industrial policies, screening evaluation factors, determination of evaluation grades, identification of wind directions, rose charts, and evaluation Price range, determine environmental sensitive points and protection targets, monitoring sites and so on. The monitoring points shall be based on the requirements for wind pollution, frequency, environmental sensitive points, environmental protection targets and environmental functional areas And the principle of uniform distribution, taking into account the arrangement of points. 2. completion acceptance monitoring - BMW Brilliance Automotive Company construction project Second questions (must be done) is a case of industrial acceptance, mainly on the examination of enterprises containing heavy metals, fluoride, nickel and other pollutants How should the waste water of dyeing be checked and monitored?. The test sites concerned are to determine the monitoring scope of the completion of environmental protection facilities, and identify the first pollutants and the first pollutants The emission standard shall be set up at the workshop discharge port, the si

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档