历年环评工程师案例分析真题考点剖析(05-07年)(Over the years the EIA Engineer case analysis test Zhenti analysis (05-07)).doc
- 1、本文档共25页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
历年环评工程师案例分析真题考点剖析(05-07年)(Over the years the EIA Engineer case analysis test Zhenti analysis (05-07))
历年环评工程师案例分析真题考点剖析(05-07年)(Over the years the EIA Engineer case analysis test Zhenti analysis (05-07))
China Environmental Impact Assessment net collection
China Environmental Impact Assessment net collection
make
One
Over the years the EIA Engineer exam test center analysis case analysis
An analysis of the key points of a.05 case
05 years of case analysis papers
8 questions, before
The 2 is to do the problem, all industrial cases (involving building materials, machinery items)
Second of these are industrial acceptance cases. Back
6 cases need to be chosen
4, including industrial cases
4 questions (involving)
And social services, real estate, chemicals, light industry, hazardous waste disposal), ecological cases
2 questions (involving highways, gas pipelines).
The first question (must be done) is about a cement plant expansion project.
The test sites involved include industrial policies, screening evaluation factors, determination of evaluation grades, identification of wind directions, rose charts, and evaluation
Price range, determine environmental sensitive points and protection targets, monitoring sites and so on.
The monitoring points shall be based on the requirements for wind pollution, frequency, environmental sensitive points, environmental protection targets and environmental functional areas
And the principle of uniform distribution, taking into account the arrangement of points.
2. completion acceptance monitoring - BMW Brilliance Automotive Company construction project
Second questions (must be done) is a case of industrial acceptance, mainly on the examination of enterprises containing heavy metals, fluoride, nickel and other pollutants
How should the waste water of dyeing be checked and monitored?.
The test sites concerned are to determine the monitoring scope of the completion of environmental protection facilities, and identify the first pollutants and the first pollutants
The emission standard shall be set up at the workshop discharge port, the si
您可能关注的文档
- 华为、美能达的绩效考核秘诀(HUAWEI, Minolta performance tips).doc
- 华南植物,不全(Southern China plant, incomplete).doc
- 华南师大外文学院真题(Southern China Normal College of foreign languages.).doc
- 华佗五禽图健身法练习要领(Hua Tuo five bird figure fitness method exercise Essentials).doc
- 华南理工大学2012考研复试分数线公布(South China University of Technology 2012 postgraduate entrance examination retest scores announced).doc
- 华帝减利润 不要怪奥运(Don't blame the Olympics for Vatti's profit margins).doc
- 华附初中趣味数学题(China Junior High School Math interest).doc
- 华立集团对标胜任素质模型开发领导力(HOLLEY group benchmarking competency model development leadership).doc
- 单位发放实物福利的财税处理(Fiscal and taxation treatment of unit offering physical benefits).doc
- 卓越团队训练(Team training excellence).doc
- 第12课 大一统王朝的巩固 课件(20张ppt).pptx
- 第17课 君主立宪制的英国 课件.pptx
- 第6课 戊戌变法 课件(22张ppt).pptx
- 第三章 物态变化 第2节_熔化和凝固_课件 (共46张ppt) 人教版(2024) 八年级上册.pptx
- 第三章 物态变化 第5节_跨学科实践:探索厨房中的物态变化问题_课件 (共28张ppt) 人教版(2024) 八年级上册.pptx
- 2025年山东省中考英语一轮复习外研版九年级上册.教材核心考点精讲精练(61页,含答案).docx
- 2025年山东省中考英语一轮复习(鲁教版)教材核心讲练六年级上册(24页,含答案).docx
- 第12课近代战争与西方文化的扩张 课件(共48张ppt)1.pptx
- 第11课 西汉建立和“文景之治” 课件(共17张ppt)1.pptx
- 唱歌 跳绳课件(共15张ppt内嵌音频)人音版(简谱)(2024)音乐一年级上册第三单元 快乐的一天1.pptx
文档评论(0)