发电厂2010年度工作总结(Work summary of power plant in 2010)
发电厂2010年度工作总结(Work summary of power plant in 2010)
Work summary of power plant in 2010
2010 was a very extraordinary year for the reform and development of our factory. In June this year, the original thermal power plant was re divided according to professional needs, and power plants and power plants were set up. I plant to conscientiously implement the company strategy, adhere to the premise of safety, taking economic benefits as the center, establish and improve various rules and regulations, pay attention to safety education and technical training, strengthen the team construction and equipment management, focus on production safety efforts in the management, the up and down unity, hard work, the work of solid progress, and achieved good results. The main work of our factory in 2010 is summarized as follows:
First, the production situation is gratifying, the monthly power generation record of repeated historical records, the economic indicators exceeded the target to complete the task.
This year, I plant the production safety carefully organize the gas stove, obey production scheduling, reasonable utilization of coal gas resources, reduce resource waste and environmental pollution, improve the utilization rate of blast furnace gas as the focus of the standard potential of our factory. On this basis, strengthen production coordination, grasp the power output capacity of power generation equipment, do a good job of balancing the steam supply and power generation, make full hair and stable hair, adjust the running equipment and operation mode in time, and reduce power consumption. By the end of November 30th, completed a total generating capacity of 261 million 800 thousand KW? H, super company 16 million 800 thousand year plan KW? H, for the planned target of 107%; standard coal rate of 577g/KW? H, 43g lower than the planned target of the company; the power consumption rate was 10.58%, 3.42 percentage points lower than planned; foreign steam 320 thousand tons. 7-1
您可能关注的文档
- 华为、美能达的绩效考核秘诀(HUAWEI, Minolta performance tips).doc
- 华南植物,不全(Southern China plant, incomplete).doc
- 华南师大外文学院真题(Southern China Normal College of foreign languages.).doc
- 华佗五禽图健身法练习要领(Hua Tuo five bird figure fitness method exercise Essentials).doc
- 华南理工大学2012考研复试分数线公布(South China University of Technology 2012 postgraduate entrance examination retest scores announced).doc
- 华帝减利润 不要怪奥运(Don't blame the Olympics for Vatti's profit margins).doc
- 华附初中趣味数学题(China Junior High School Math interest).doc
- 华立集团对标胜任素质模型开发领导力(HOLLEY group benchmarking competency model development leadership).doc
- 单位发放实物福利的财税处理(Fiscal and taxation treatment of unit offering physical benefits).doc
- 卓越团队训练(Team training excellence).doc
最近下载
- 团知识竞赛试题及答案.docx VIP
- 湖南工程学院《大学物理》2023-2024学年第一学期期末试卷.doc VIP
- 小学社团活动——啦啦操18节课时教案.docx
- 在线网课学习课堂《工程伦理》单元测试考核答案.docx
- 2024年山东省《辅警招聘考试必刷500题》考试题库附完整答案【全优】.pdf VIP
- T_CECS 992-2022CN 预应力压接装配混凝土框架应用技术规程.docx
- 【课件】第1课+美术作品的创作+课件-高中美术人教版(2019)美术鉴赏.pptx VIP
- 网络交易案件办理专题培训课件.pptx
- 《接发列车工作 》课件(下).pptx VIP
- 粤版_通用技术2_技术与设计2__教案.doc VIP
文档评论(0)