- 1、本文档共19页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地基土处理(Foundation soil treatment)
地基土处理(Foundation soil treatment)
Method and construction technology of bad foundation soil, treatment and reinforcement
Substitution method
(1) replacement method
It is to dig out the bad foundation soil of the surface layer, and then backfill the soil with better compaction characteristics to compaction or tamping, and form a good bearing stratum. Thereby, the bearing capacity characteristics of the foundation can be changed, and the deformation resistance and stability can be improved.
Construction points: the soil layer to be converted, pay attention to the stability of the pit; to ensure the quality of the filling; filling should be layered and compacted.
(2) vibro replacement method
By using special vibratory machines and tools, under the high pressure water jet, the edge of the edge is washed and made into holes in the ground, and then piles of gravel or gravel are formed in batches to form a pile body. The composite foundation is made up of the pile body and the base soil in order to improve the bearing capacity of the foundation and reduce the compressibility.
Note: the construction of gravel pile bearing capacity and settlement largely depends on the in-situ soil lateral constraints on it, the constraint effect is weaker, the effect of gravel pile is worse, so the method for soft clay strength is very low when must be careful.
(3) tamping (extrusion) replacement method
The pipe (hammer) is put into the soil by means of an immersed tube or a rammer, so that the soil is pushed to the side, and the gravel or sand is filled in the pipe (or tamping hole). The pile and soil in composite foundation, the soil compaction due to extrusion, lateral extrusion, surface uplift, soil pore water pressure increases, when the dissipation of excess pore water pressure after the soil strength is also a corresponding increase.
Construction note: when the filling is good permeability of sand and gravel, it is a good vertical drainage channel.
Two, preloading method
(1) surcharge
您可能关注的文档
- 参苓白术散(SHENLINGBAISHU).doc
- 县长在率党政代表团到XX考察时的讲话(Speech of the county magistrate's delegation from the party and government to the XX expedition).doc
- 叉车的选择与应用(Selection and application of forklift truck).doc
- 叉车资料(Forklift data).doc
- 友谊如春风(Friendship is like spring breeze).doc
- 反P2P终结者使用工能技巧(Anti P2P terminator uses energy technology).doc
- 反不正当竞争行为法律解释答复汇集3(Anti Unfair Competition Act, legal interpretation, reply, 3).doc
- 叉车(Forklift).doc
- 发出去的分段短信码流(Segment SMS stream sent out).doc
- 反思一年级孩子的朗读(Review first grade children's reading).doc
最近下载
- GB 50373-2019 通信管道与通道工程设计标准.docx
- 钱钟书《吃饭》课件.pptx VIP
- 肝功能异常解析课件.ppt VIP
- 赞美女员工的文章.doc VIP
- 哈弗-哈弗H6-产品使用说明书-哈弗H6 1.5T自动两驱精英型-CC6460RM07-哈弗H6(升级版)-使用说明书-中文-01-16.01-01M.pdf
- 财务管理专业研究生复试面试个人简历模板单页Word.docx
- 国际潘通色卡电子版(PMS+COLOUR+CHART)必威体育精装版版-免费下载.pdf
- 省英语优质课Melting-ice教学课件.pptx
- 计算机毕业设计论文 基于OpenCV的疲劳驾驶预警系统.docx
- 二次根式测试题附.pdf VIP
文档评论(0)